Prepare Zinc Production Techno-Bankable Project Report

Fermé Publié le Apr 1, 2016 Paiement à la livraison
Fermé Paiement à la livraison

Hi,

I am interested in putting up a 1000 Tonnes per Annum SHG zinc metal production plant. Inputs I want to use is secondaries ( mainly zinc ash, EAF dust etc). I want to use leaching and solvent extraction low cost route . I am looking for someone who can prepare a bankable project report for this.

Basically i am looking for a Techno-Economic Project report wherein following would be major deliverable

1. Design a flow sheet based on Leach-SX-EW route

2. Prepare Project report: i.e land requirement, infrastructure requirement, process description, raw material specs, potential Indian/global suppliers, Equipment details & specs etc

3. Financials Capex, Opex & IRR

(Detail Engineering is not required)

Raw material: Galvanized zinc ash & EAF dust

Capacity required: 1000T per annum SHG Zinc

Location of Project: India

Regards

A Garg

Ingénierie Gestion de Projet

Nº du projet : #10100748

À propos du projet

Projet à distance Actif May 10, 2016