Find Jobs
Hire Freelancers

Energy Balance for Boiler -- 2

£10-20 GBP

Annulé
Publié il y a presque 4 ans

£10-20 GBP

Payé lors de la livraison
The details are below-: A mixture of benzene, air and hydrochloric acid is fed to a chlorination reactor (R1) producing monochlorobenzene (MCB) as the primary product and 1,2 dichlorobenzene (DCB) as a side product. The reactor operates continuously with a 10% conversion per pass of benzene while 1% of the benzene converted per pass combusts. The reactor operates isothermally at 250°C with all reactants entering at the reactor temperature. The hot reactor products pass to a boiler wherein they are used to boil water to produce dry saturated steam at 100°C all of which is fed to a heat exchanger which preheats recycled hydrochloric acid on route to R1. The cooled reactor products exit the boiler at 140°C and immediately pass to a second heat exchange unit which further cools the process stream to 40°C prior to discharge into a vented vessel which allows non-condensable species to exit the process. The process operates at steady state, the levels in the buffer (holding) tanks do not change under normal operating conditions and all pressures are approximately 1 bar absolute. Benzene and hydrochloric acid (5 wt%) are available from separate storage facilities to feed the process as required. Process conditions are such that no HCl gas leaves the chlorination unit, hydrogen gas does not appear in the process, discharge to drain must not exceed 750 kg/hour, the molar feed ratio (steam/MCB) for the hydrolysis unit is 3 and the R1 air/benzene mixed feed molar ratio is 1. I need to work out the energy balance for the boiler and then this what needs to be done further-: For the boiler, you should report with supporting calculation the energy flows corresponding to all streams entering and leaving the exchanger leading to calculation of the overall duty of the heat exchanger H2 (in kW) and the water flowrate required (assume that the water is supplied at 20°C). The material balance and process flow are attached.
N° de projet : 25317348

Concernant le projet

1 proposition
Projet à distance
Actif à il y a 4 ans

Cherchez-vous à gagner de l'argent ?

Avantages de faire une offre sur Freelancer

Fixez votre budget et vos délais
Soyez payé pour votre travail
Surlignez votre proposition
Il est gratuit de s'inscrire et de faire des offres sur des travaux
1 freelance propose en moyenne £20 GBP pour ce travail
Avatar de l'utilisateur
Greetings! I’m very much interested to do the ENERGY BALANCE ON BOILER. I am a CHEMICAL ENGINEER with over 5 years of experience, therefore, I can easily do this job. I will also provide you with Turnitin Plagiarism Report. You can message me to discuss the details. Why me? My goal is to offer services to you that are profitable. I don’t want you to place an order once and that’s it. For me to be successful, I need you to come back and order again. Give me the opportunity to work on your project. I wish to build a long-term relationship with you. We can have further discussion in chat. Thanks! Warm Regards, Arslan Safder
£20 GBP en 1 jour
5,0 (3 commentaires)
2,6
2,6

À propos du client

Drapeau de UNITED KINGDOM
Horsham, United Kingdom
0,0
0
Membre depuis mai 5, 2020

Vérification du client

Merci ! Nous vous avons envoyé un lien par e-mail afin de réclamer votre crédit gratuit.
Une erreur a eu lieu lors de l'envoi de votre e-mail. Veuillez réessayer.
Utilisateurs enregistrés Total des travaux publiés
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Chargement de l'aperçu
Permission donnée pour la géolocalisation.
Votre session de connexion a expiré et vous avez été déconnecté. Veuillez vous connecter à nouveau.