EXPLORE

Chemical Engineering
Profile cover photo
User Avatar

Sohail A.

@sohafs21

0.0
0

0.0

0.0

0%

$15 USD / Hour

Flag of

Pakistan (9:38 AM)

Joined on April 28, 2008

$15 USD / Hour

MOHAMMAD SOHAIL AKHTER A-21 Nazish Apartment Sector 7D/4 North Karachi Karachi, Pakistan Telephone No: [login to view URL] Email: . ; CAREER OBJECTIVE Leader and team builder, an impressive track record of more than 18 years of hands-on experience in all technical aspects of commissioning of Power Plant chemical related equipments and economic water treatment solutions for water, boiler water, reverse osmosis, demineralization and clarification/effluent treatment plants and cooling tower along with strategic planning and Solid leadership skills to be able to build and guide top-performing team AREAS OF EXPERTISE Strategic planning Commissioning Boiler Water treatment Cooling Water Treatment RO plants/Demin Plants Report writing Team leadership/development Influencing and impact Operations Management QUALIFICATION • Master of Science ([login to view URL].) APPLIED CHEMISTRY. • Diploma of Associate Engineer. CHEMICAL TECHNOLOGY • Master of Business Administration (MBA) HUMAN RESOURCE MANAGMENT Visit China One month for the training of 560 MW project. PROFESSIONAL EXPERIENCE May 2012 ~ Onward Working as Deputy General Manager Chemistry in 560MW Bin Qasim Power plant BQPS-II Configuration of (3 GE 9E, 3 HRSG 7 1 ST) at KE (Former Karachi Electric Supply Corporation (KESC), at Karachi. Responsibilities during Erection (Company Harbin Electric International China)  Inspection and monitor of Site activities during the erection job of Water Treatment Plant – Pretreatment System, waste water treatment System , oily waste treatment System , Electro chlorination treatment System , HRSG dosing System and HRSG Sampling System.  Join meeting with planning and execution of all chemical related units with EPC contractor HE and report to Director Plant of KESC (Karachi Electric Supply corporation)  Review all chemical units’ project activities and report to director KESC.  Review all P&IDs of all Chemical units and monitor the jobs during the erection.  Schedules , Directs and assigns duties of engineers, technicians and other staffs during the erection of Jobs  Review papers of all commissioning and testing reports Responsibilities during Commissioning (Company Harbin Electric International China)  Work with EPC Commissioning team and manage Operation of: 2x550 m3/hr Clarifier, 3x250 m3/hr UF Plant, 2x135 m3/hr SWRO, 2x100 m3/hr BWRO and 2x145 m3/hr Demin plant.  Work with EPC Commissioning team and manage Operation of Waste, Oily and Sanitary Water treatment Plant.  Work with EPC Commissioning team and manage Operation of: Sea water Electro chlorination Plant (For Online generation of NaOCl  Work with EPC Commissioning team and Manage Operation of HRSG dosing and sampling system..  Managing of Water and Oil laboratory.  Responsible of all adequate supply and optimum of chemical consumables, compile and safe keeping of records.  Proper Planning, Budgeting and Control for chemical section.  Familiar with SAP , OSHAS 18001, ISO 1400I (EMS) December2008 ~ May 2012. (3.5 Years) Worked as Manager Chemistry in 220MW Combine Cycle Power Plant (CCPP) at Karachi Electric Supply Corporation (KESC), at Karachi Responsibilities during Erection (EPC Contractor METKA)  Monitor of Site activities during the erection job of Water Treatment Plant – HRSG dosing System and HRSG Sampling System.  Discussed with EPC Contractor METKA regarding the planning and execution of all chemical jobs.  Monitor all activities and report to commissioning Manager from KESC.  Review all P&IDs of all Chemical units and monitor the jobs during the erection.  Assigns duties of engineers, technicians and other staffs during the erection of Jobs  Review papers of all commissioning and testing reports Responsibilities during Commissioning (EPC Contractor METKA)  Work together with EPC contractor METKA during the Commissioning of 50 m3/hr Sea Water Reverse Osmosis Plant.  Work together with EPS contractor METKA during the Commissioning of HRSG dosing and sampling system.  Fully involved with EPC contractor METKA and monitoring of HRSG chemical cleaning.  Managing of Water and Oil laboratory.  Controlling the quality of Boiler Feed Water, Circulating Water and Closed Cooling Water System.  Responsible of all adequate supply and optimum of chemical consumables, compile and safe keeping of records.  Proper Planning, Budgeting and Control for chemical section. December2007~ December 2008 ( 1.1 Years) Worked as a Plant Chemist in 94MW Combine Cycle Power Plant (CCPP) & Pakistan First 3 Million Gallon per Day (MIGD) Desalination Plant at DHA Cogeneration Ltd, Karachi Responsibilities  Standard Operation and Performance of Water Treatment plant (2 x 15 m3/hr).  Monitoring of Water chemistry of 2x 285 m3/hr Desalination Units and related system to ensure consistent of water quality and that chemical treatments are performed according to the specification.  Monitoring of 580 m3/hr or 3 mega gallons Portable Water System and re- mineralize to make it potable water by adding minerals as per WHO recommended standard.  Controlling the quality of Boiler Feed Water, Circulating Water and Closed Cooling Water System.  Responsible of all adequate supply and optimum of chemical consumables, compile and safe keeping of records.  Proper Planning, Budgeting and Control for chemical section.  Maintain laboratory equipment accuracy with proper calibration standard method August 1999 ~ November2007 (6.11 Years) Worked as a Senior Plant Chemist / Environmental Coordinator in 1x235 MW Combined Cycle Gas Turbine Power Station at TNB Liberty Power Complex (Malaysian based Organization) Mirpur Mathelo Distt. Ghotki (Sindh). Responsibilities  Standard Operation and Performance of Water Treatment plant (2 x 50 m3/hr), Softening Plant (4x90 m3/hr), Reverse Osmosis Plant (1x20 m3/hr), Water pre – treatment System (2x450 m3/hr), Drinking water purification System (6 m3/hr) and Wastewater treatment plant (8 m3/hr).  Controlling the quality of Boiler Feed Water, Circulating Water and Closed Cooling Water System.  Responsible of all adequate supply and optimum of chemical consumables, compile and safe keeping of records.  Proper Planning, Budgeting and Control for chemical section.  Maintain laboratory equipment accuracy with proper calibration standard method. October 1997 to August 1999 ( 1.10 Years) Worked as a Commissioning Chemist in 1x235 MW Combined Cycle Gas Turbine Power Station at Liberty Power Complex with Ansaldo Energia (Italian based Organization) Mirpur Mathelo Distt. Ghotki (Sindh). Responsibilities during Erection ( Ansaldo Energia)  Work together during the erection of Water Treatment Plant – Pretreatment System, waste water treatment System, oily waste treatment System, HRSG dosing System and HRSG Sampling System.  Join meeting for the planning and execution of all chemical related units.  Review all chemical units’ project activities and report to Commissioning Manager.  Review all P&IDs of all Chemical units and monitor the jobs during the erection.  Review papers of all commissioning and testing reports Responsibilities during Commissioning ( Ansaldo Energia)  Commissioning of Demineralization system latest technology from thermokimic Italian Company plc from Simian Germany completely automatic /manual system.  Commissioning of Pre - treatment plant capacity 450 mc/hr. Latest technology from thermomacanic Italian Company completely automatic/Manual system.  Commissioning of Waste Water Treatment Plant latest technology from thermokimic Italian Company plc from Simian Germany completely automatic /manual system.  Commissioning of Chemical injection system for condenser, feed water system, cooling tower, Auxiliary boiler and H.R.S.G system.  Commissioning of Sampling system for Boiler Feed Water System March 1997 to September 1997. (0.7 Years) Worked as a Shift Chemist in 4x323 MW Oil fired power Station at Hub plant, Distt. Lasbela, Baluchistan with National Power International (British based Organization) Responsibilities  Standard Operation of Water Treatment plant and Wastewater treatment plant.  Routine Work of Chemical injection System of the boiler and controlling the parameters of boiler water required during the Boiler operation.  Maintain laboratory equipment accuracy with proper calibration standard method. May 1996 to March 1997 (0.11 Years) Worked as a Commissioning Chemist in 4x323 MW Oil fired power Station at Hub plant, Distt. Lasbela, Baluchistan with Ishikawajima – Harima Heavy industries. LTD (IHI). (Japanese Organization) Responsibilities  Commissioning of Demineralization system capacity of 50 tons per hour.  Commissioning of wastewater Treatment Plant.  Commissioning of Chemical Injection System of the Boilers.  Involved with IHI experts during the chemical cleaning of the boiler. October 1989 to October 1991 ( 2 Years) Worked as an Analytical Chemist in Water Man International (PVT) LTD. Karachi. Responsibilities  Analysis and control quality of water of the boiler from different samples, which represent Condenser, Detractor, Boiler drum etc.  Analysis of Oil with Latest equipment such as Moisture meter, Pour Point meter, Viscosity meter, Spectrophotometer meter and many more.. COMPUTER SKILLS • Word • Excel • Power Point • Visio • MS Office PERSONEL INFORMATION Father Name : Syed Shafi Uddin Marital Status : Married

0.0 · 0 Reviews
Reviews

No reviews to see here!

Verifications

Registered Users

Total Jobs Posted

Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)

Copyright © 2025 Freelancer Technology Pty Limited (ACN 142 189 759)