Project work summary

par sharifbit99
Type de fichier non supporté

My project work demonstrator report summary

image of username sharifbit99 Flag of Bangladesh CHITTAGONG, Bangladesh

Me concernant

1. Completed design, fabrication of Heat Exchanger, Warm Air Furnace of Powder Coating Plant and installation, commissioning of the plant 2. Completed design, fabrication of 50 feet Dryer for Pr- treatment plant. 3. Completed Design, estimation, installation of Auto Pre-treatment plant (Metal Phosphate., Zn-plating Plant.) 4. Developed, design modified 30 nos. imported executive chair models in house to set up new production line. 5. Completed design, fabrication and installation of wood seasoning kiln and heat exchanger. 6. Completed design and installation of effluent treatment plant (ETP) 7. Knowledge of design and fabrication and installation of various fluids flow ducting system for factory. 8. Knowledge of Production layout, Re-Engineering, Line balancing, Process re-engineering, 9. Knowledge of design, estimation, installation of WTP (Water Treatment Plant). 10. Have learned experience as a project engineer during working on 110 MW Rental HFO/ Diesel Power plant Project of Quantum Power System Limited, (QPSL), a sister concern of OTOBI.

$20 $ US / h

NOUVEAU FREELANCE !

Étiquettes