EXPLORE

CAD/CAM Electrical Engineering Microsoft Outlook Powerpoint Resumes
Profile cover photo
User Avatar

Abdul Razak S.

@saraz

0.0
0

0.0

0.0

0%

Electrical Engineer

$20 USD / Hour

Flag of

Saudi Arabia (9:51 AM)

Joined on August 2, 2008

$20 USD / Hour

Providing assistance for electrical problems. Maintenance of various equipment like Generators, welding machines, bar bending machines, Earth pits & various construction equipment. Preparing electrical & power layouts, single line diagrams (SLD), riser diagrams & Schematic Drawings. Preparing Daily Progress reports (DPR) & NMR reports. Project Planning, Cost analysis & preparing projections. Estimation & preparing comparative statements from various quotations. Manpower & Material Planning. Design checking & Solving. Preparing BOQ’s & comparing with actual quantity as per requirements. Preparing clients & sub-contractor billing. Co-ordination with all services (Like Fire fighting & HVAC with Electrical). Auto Cad & MS Office Proficiency.

0.0 · 0 Reviews
Reviews

No reviews to see here!

Experience

Electrical Engineer – Construction & Maintenance Department

Sep, 2015 - Present

10 years, 2 months

King Fahd University of Petroleum & Minerals – Nabil A. Abu Nahya Partner & Co.

Sep, 2015 - Present

10 years, 2 months

Work: Installation of Distribution Transformers, Generators, Control Panels, HT, LT & Underground cable work, 33/11KV, 33/.433KV & 11/.433 KV substation work, Internal & External Electrification work, Emergency Lighting Through UPS with Solar panels, Fire Alarm system, Public Addressing(PA) system, CCTV Work, Master TV, Telephone, Computer network systems, Fire Fighting, Automatic Sprinkler System, HVAC Work, Site maintenance & various equipments maintenance work.

Sep, 2015 - Present

10 years, 2 months

Senior Electrical Engineer

Apr, 2014 - Sep, 2015

1 year, 5 months

Maksi Consultech limited

Apr, 2014 - Sep, 2015

1 year, 5 months

Installation of Distribution Transformers, Generators, Control Panels, HT, LT & Underground cable work, 33/11KV, 33/.433KV & 11/.433 KV substation work, Internal & External Electrification work, Emergency Lighting Through UPS with Solar panels, Fire Alarm system, Public Addressing(PA) system

Apr, 2014 - Sep, 2015

1 year, 5 months

Assistant Engineer – Electrical

Sep, 2010 - Apr, 2014

3 years, 7 months

IVRCL Limited

Sep, 2010 - Apr, 2014

3 years, 7 months

Work: HT, LT & Underground cable work from one existing 33/11 KV substation to another existing 33/11 KV substation to Distribution transformers, HT, LT & Underground cable work, Building Internal & External Electrification Work, LT & HT Panel installation, Total Fire Prevention system, Fire Alarm System & Maintenance Work.

Sep, 2010 - Apr, 2014

3 years, 7 months

Education

Jawaharlal Nehru Technological University

2006 - 2010

4 years

Bachelor of Technology (Electrical & Electronics Engineering)

Flag of

India

2006 - 2010

4 years

Qualifications

web designing

2010

School of Computer Graphics

from Apr’ 09 to Jan’10.

2010

Verifications

Registered Users

Total Jobs Posted

Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)

Copyright © 2025 Freelancer Technology Pty Limited (ACN 142 189 759)