Image de profil de ljmcintyre
@ljmcintyre
Drapeau de Canada Fort Smith, Canada
Membre depuis le 24 janvier 2012
0 Recommendations

ljmcintyre

En ligne Hors ligne
I have always had a love for the outdoors, and the way it all worked together – The water cycle, terrain, weather, geology – its all related. While completing my Geomatics Engineering Technology Diploma program, I was introduced to Geographic Engineering Technology (GIS) and was immediately hooked! Everything that I loved about our environment, every spatial relationship could be representedwith this tool! GIS Analysts also require a diverse skill set, from geography, to communication, analytical skills to information gathering, computer science and mathematics to ca...  Read more
0 commentaires
0.0
  • N/ATravaux complétés
  • N/ASelon le budget
  • N/ADans les temps
  • N/ATaux de Réembauche

Éléments du portfolio

Avis récents

Aucun commentaire.

Expérience

Air Quality Assessment and Approval, Lethbridge, AB (Project Lead)

Dec 1969 - Dec 1969 (1 month)

Ambient air quality assessment, mapping and reporting. Data Collection and compiling. Approval submission.

Phase I Environmental Site Assessment

Dec 1969 - Dec 1969 (1 month)

Conducted Phase I Environmental Site Assessments for industrial clients for the purpose of real estate transactions and tenant agreements for Viterra. These involve the review of historical records, aerial photo and map interpretation, interviews with site personnel, site and building inspections and report preparation including recommendations to address potential environmental concerns.

Phase II Environmental Site Assessment

Dec 1969 - Dec 1969 (1 month)

Conducted Phase II Environmental Site Assessments for industrial properties in the determination of site contamination and delineation. The assessments included borehole investigations, field vapor analysis, soil sampling, air quality monitoring, data analysis and comparison with current environmental guidelines and report preparation.

Sentinel / CrowsnestMountain Resort, Crowsnest Pass, AB (GIS Technician / Drafting / Design)

Dec 1969 - Dec 1969 (1 month)

Preliminary CAD and GIS design of mountain resorts including underground utilities, site grading plans and roadways. Digital terrain model creation. Underground utility network assessment and detailed design including existing system upgrades.

RiverStone, Lethbridge, AB (GIS Tech/Drafting/Design)

Dec 1969 - Dec 1969 (1 month)

Preliminary CAD and GIS design of RiverStone subdivision, primarily stormwater management.

Shelter Bay Lands, Shelter Bay, BC (Project Design)

Dec 1969 - Dec 1969 (1 month)

Marina dock and site civil, utilities, earthworks and approvals.

Park Meadows Storm Trunk, Medicine Hat, AB (GIS Tech / CAD Drafting / Lead Design)

Dec 1969 - Dec 1969 (1 month)

Translate existing GIS to CAD linework for analysis of existing system failures. Create profiles, survey data and design drawings.

Brooks Greenhouse, Brooks, AB (CAD Design)

Dec 1969 - Dec 1969 (1 month)

Stormwater site grading including storm retention ponds.

RMWB Sanitary Trunk & Crossing, Regional Municipality of Wood Buffalo, AB (GIS Tech / Drafting)

Dec 1969 - Dec 1969 (1 month)

CAD linework integration into GIS for design analysis. Support design team with preliminary and detailed design of 6km upgrade of twinned sanitary trunks including river crossing.

2010 Playground Program, Lethbridge, AB (Design Lead)

Dec 1969 - Dec 1969 (1 month)

Redevelopment of 5 playground sites, including earthworks, grading, playground equipment layout, lighting, electrical distribution and tie-in, and planting. Correlation of new playground and tot lot with on-site contractor. All sites were quantified and cost estimates were provided to maintain budget. Contract documents prepared.

South Fraser Perimeter Road, Delta, BC (Design Lead)

Dec 1969 - Dec 1969 (1 month)

Development of 8-phased major road project spanning Langley, Delta and Surrey BC. Primarily responsible for drainage design of Segment 4, lowlands in Delta. Design included upgrading and redesigning existing major yellow and red-coated wildlife crossing culverts and ditches as well as design of new drainage system with roadway, including outfalls.

WorkTech Asset Management Implementation, Fort Smith, NT (Database Management)

Dec 1969 - Dec 1969 (1 month)

Computerized asset management, work order and maintenance program. Data collection and integration into asset management software. Quality control and assurance checks, data configuration and maintenance.

2005 / 2006 Facilities Assessment Condition Audit, Lethbridge, AB (Database Management)

Dec 1969 - Dec 1969 (1 month)

Database management, translation of in field data to digital database. Report coordination and final submission. Coordination of mechanical, electrical, structural, and site field reports. Compile digital imagery.

Island Lake Development, Fernie, BC (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Overland drainage analysis for stormwater master plan estimate and preliminary report.

Garry Station Outline Plan, Lethbridge, AB (GIS Analyst)

Dec 1969 - Dec 1969 (1 month)

Deep utility preliminary design, planning, zoning for multi-client, city administration and council approval.

Leisure Trails and Alternative Transportation Needs Assessment and Public Consultation, Medicine Hat, AB (GIS Analyst)

Dec 1969 - Dec 1969 (1 month)

Data collection and management. Supported assessment team with data compilation, assessment and results. Project led to the development of a Master Plan

Future Trail System Development Plan, Medicine Hat, AB (GIS Analyst)

Dec 1969 - Dec 1969 (1 month)

Expanded on results of Needs Assessment. Prepared public open house figures and compiled for use in ongoing stakeholder/ design team analysis.

Eastside StormwaterMaster Drainage Plan, Redcliff, Alberta (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Data translation from existing CAD linework to GIS data files. Base map for town’s underground utilities including water, wastewater and stormwater. System data analysis, and correlation with population and landuse for hydraulic modeling.

2006 Water & Wastewater Master Plans, MD of Crowsnest Pass, AB (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

System data analysis and correlation with population, landuse, and DEM for hydraulic modeling for 30 year sustainable growth servicing plan.

2006 Utility Master Plans, St. Albert, AB (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Produce cartographic figures of model results for deliverables.

Pincher Creek StormwaterMaster Plan, Pincher Creek, AB (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Data preparation and analysis. Digital terrain model creation and correlation. Overland drainage plan.

Pincher Creek Parks & Open Spaces Master Plan, Pincher Creek, AB (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Cartography for conceptual master plan and existing parks and open spaces analysis and recommendations.

City of Cranbrook Growth Management Study, Cranbrook, BC (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Water and Wastewater Master Plans – data collection and correlation, supporting modeling team with hydraulic modeling development and results. Sewershed / zoning delineation, and correlation with landuse, population and growth areas for analysis. Compile results for deliverables.

RMWB Wastewater Master Plan, Regional Municipality of Wood Buffalo, AB (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Data collection and management. Preliminary model development including sewersheds, landuse and population correlation as well as future growth servicing requirements. Compile results for deliverables.

Parks and Open Spaces Master Plan, Medicine Hat, AB (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Data collection, management and correlation between GIS, CAD and Photoshop. Support of design team with needs assessment, classifications, priorities, digitizing and assessing protected/endangered flora and fauna.

Municipal Facilities Replacement Value Estimate, MD of Crowsnest Pass, AB (Database Management / GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Designed & managed building replacement cost estimate database. Compiled / digitized in field data collection and imagery. Produced cost estimates for all facilities. Compile existing facility records. Coordination of final report submission.

Bellevue Wastewater Treatment System Evaluation, Bellevue, AB (GIS Technician / Drafting / Design)

Dec 1969 - Dec 1969 (1 month)

Analysis of available record & as-built drawings, and assessment of missing data. System analysis. Preliminary and detailed design of upgrade to treatment system to meet Alberta Environment standards.

2005 Flooding Investigation (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Data collection of storm system flow monitor readings, public operations data correlation with land use, population, and rainfall data to investigate network failures.

City of Lethbridge Water Distribution System Assessment (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Creation of city’s water distribution base map in GIS. Assisted in production of water network analysis.

City of Lethbridge StormwaterQuality Data Collection Program (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Designed base map for Lethbridge stormwater network. Definition of stormwater catchments in the City of Lethbridge. Correlated catchments with population and land use for analysis.

Medicine Hat Drainage Studies (GIS Technician)

Dec 1969 - Dec 1969 (1 month)

Designed database inspection reports for the outfalls of the City of Medicine Hat’s Storm Sewer Network, created database of data and correlated into GIS. Assisted in GIS production for the analysis of the city’s Storm Sewer Network flooding. Preliminary design of improvement alternatives.

Brooks 2007 Wastewater System Evaluation, Brooks, AB (GIS Analyst)

Dec 1969 - Dec 1969 (1 month)

Digitize existing lift station data for hydraulic modeling. Create sewer sheds, lift station and thiessen polygons for model. Compile results for deliverables.

2008 Facilities Assessment Condition Audit, Lethbridge, AB (Project Lead / Database Management)

Dec 1969 - Dec 1969 (1 month)

Database management, team coordination, budget and schedule control.

Northwest Sector Phase II, Medicine Hat, AB (GIS Analyst)

Dec 1969 - Dec 1969 (1 month)

Preliminary design of regional storm trunk, trunk upgrade and wetland.

Northwest Sector Drainage Improvements, Medicine Hat, AB (GIS Tech / Design)

Dec 1969 - Dec 1969 (1 month)

GIS data collection and support for analysis of existing system failures. Design lead for 3km of drainage canal including hydraulic capacity, land acquisition and crossing agreements.

NE/NW Crescent Heights Drainage Study, Medicine Hat, AB (GIS Lead)

Dec 1969 - Dec 1969 (1 month)

GIS team lead. Data collection, correlation, and analysis. Major and minor stormwater system catchment delineation, and mapping of existing system flooding limits, public responses, and preliminary improvement design.

Municipal Infrastructure Network Mapping, Fort Smith, NT (GIS Analyst)

Dec 1969 - Dec 1969 (1 month)

Data collection and digitization of water and sewer network data. Quality control and assurance. Database configuration and maintenance.

Downtown Drainage Study, Medicine Hat, AB (GIS Lead / Project Designer)

Dec 1969 - Dec 1969 (1 month)

GIS team lead. Data collection, correlation, and analysis. Major and minor stormwater system catchment delineation, and mapping of existing system flooding limits, public responses, and preliminary improvement design. Detailed improvement design, and costing to correlate with municipalities other projects, offering cost saving opportunities.

Vulcan County Regional Waterline Feasibility Study, Vulcan, AB (GIS Analyst)

Dec 1969 - Dec 1969 (1 month)

Data collection and correlation. Coordination with local waterline design. Alignment option feasibility including profiles and pressure restrictions.

2008 Lloydminster Sidewalk Survey, Lloydminster (GIS Analyst / Project Coordinator)

Dec 1969 - Dec 1969 (1 month)

ArcPad Application Builder for data collection of sidewalk faults classified into 10 fault types and low-med-high severity levels. Upload, process, and report faults. Final report documentation.

County of Lethbridge Transportation Master Plan, Lethbridge, AB (GIS Analyst, Alternate Project Lead)

Dec 1969 - Dec 1969 (1 month)

Development of dynamic road rating system program used to analyze road network and rate to determine priorities. Used to develop a 10 year 'working capital plan' for the County of Lethbridge

2006 – 2010 Lethbridge Sidewalk Survey, Lethbridge, AB (GIS Analyst / Project Coordinator)

Dec 1969 - Dec 1969 (1 month)

ArcPad application management, data uploads, database management, final documentation preparation.

Alternate Heat Source Funding Project, Fort Smith, NT (Project Manager)

Dec 1969 - Dec 1969 (1 month)

Evaluate reduction in fuel oil heat at water treatment plant. Evaluation of infrastructure impact in lowering pre-heated water temperatures, as well as identifying alternate energy sources. Proposals to federal, territorial and private green energy initiative funding for geo-exchange heat system to include treatment plant, pump houses, water tower, and town hall.

WorkTech Asset Management Implementation, Fort Smith, NT (Project Manager)

Dec 1969 - Dec 1969 (1 month)

Computerized asset management, work order and maintenance program. Project Management included data collection, team coordination, staff and training coordination.

Town Hall Renovations, Fort Smith, NT (Project Manager)

Dec 1969 - Dec 1969 (1 month)

Coordinate multiple contractors, staff and public through renovations at Fort Smith Administration Centre.

2011 Road Works, Fort Smith, NT (Project Manager)

Dec 1969 - Dec 1969 (1 month)

Base rebuild, subgrade prep, and reconstruction of gravel roads throughout municipality including drainage redesign.

Éducation

Diploma, Geomatics Engineering Technology

1969 - 1969 (1 month)

Bachelor of Science

1969 - 1969 (1 month)

Project Management

1969 - 1969 (1 month)

Qualifications

GISP Certification

GISCI

Member

URISA International

Member

URISA, Alberta Chapter

Member

Alberta Geomatics Group

Volunteer

GeoAlberta Conference 2011

Publications

Map Gallery Award

2008 GeoAlberta Conference, Map Gallery Award, First Place Overall

Certifications

  • US English Level 1
    95%

Vérifications

  • Connecté à Facebook
  • Freelance Préféré
  • Paiement vérifié
  • Téléphone Vérifié
  • Identité Vérifiée
  • E-mail vérifié

Voir des freelances similaires