
In Progress
Posted
Paid on delivery
I am ready to move our existing PHP / MySQL‐based camera platform and its large image archive to Amazon Web Services. The main driver is scalability; peak traffic and storage demands are growing faster than our current host can handle. Scope of work • Re-architect the entire stack so application servers run on Amazon EC2, while all archived images reside in Amazon S3 for durable, cost-effective storage. • Migrate the web application and database together so the platform and archive stay in sync from day one. • Build in security best practices (VPC, subnets, IAM roles, security groups, encrypted S3 buckets, SSL termination) during each phase rather than bolting them on later. • Provide automated deployment scripts or Infrastructure-as-Code templates so we can reproduce the environment quickly in additional regions when traffic warrants. Deliverables 1. Documented migration plan with cut-over checklist. 2. Terraform, CloudFormation or similar scripts for EC2, S3, networking, and any auxiliary AWS resources you recommend. 3. Successfully migrated, fully tested production environment with zero data loss and minimal downtime. 4. Post-migration performance and cost report plus rollback/DR strategy. Acceptance criteria • Application workload runs entirely on EC2 instances behind an Elastic Load Balancer, reachable via HTTPS only. • All historical and new images stored in S3 with lifecycle policies enabled. • Database latency and page-load times equal to or better than current hosting, verified under load testing. • Environment passes OWASP top-10 security scan. If you have demonstrable experience moving PHP/MySQL workloads to AWS at scale, I’d like to see how you would tackle this and an estimated timeline for each phase.
Project ID: 40772794
109 proposals
Remote project
Active 5 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
109 freelancers are bidding on average $1,005 USD for this job

Hello, With my 15+ years of experience, I have a wealth of understanding when it comes to architecting and migrating applications at scale. AWS has been a core component of many of my projects and I've successfully migrated complex PHP/MySQL workloads like yours to the cloud hosting environment. As a result, I understand the nuances of dealing with large image databases that require durable, cost-effective storage like Amazon S3. One area where I find my previous clients especially satisfied is my ability to integrate security best practices into the initial design. This means you will not find me bolt-on solution fixing any vulnerabilities later. Instead, all necessary precautions including VPC, subnets, IAM roles, security groups, encrypted S3 buckets and SSL termination will be well thought out and executed from the beginning. Additionally, providing automated deployment scripts or Infrastructure-as-Code templates to reproduce your AWS environment in additional regions when required would be part of my deliverables. Rest assured that working with me guarantees you an optimally performing application on EC2 instances behind an Elastic Load Balancer, an OWASP compliant system with minimal downtime during transition and an environment with zero data loss under Thanks!
$850 USD in 8 days
8.6
8.6

Hi, This is Elias from Miami. I checked your project description and understand you’re looking to migrate your existing PHP/MySQL camera platform and its large image archive to AWS. This transition will enhance your platform's scalability and reliability. I’ve worked on similar migrations and understand the key technical challenges involved. My approach would involve assessing the current architecture, planning the migration strategy, and ensuring data integrity throughout the process. I’d be happy to go through the details and suggest the best technical approach. I have a few questions to get a better understanding: Q1 – What are the specific user roles that need to be accommodated in the new AWS setup? Q2 – Are there any existing integrations with other systems that we need to consider during the migration? Q3 – How do you plan to handle data backup and recovery once on AWS? Looking forward to hearing from you.
$1,200 USD in 7 days
8.6
8.6

Hi, The safest migration is not a single bulk copy. I would first establish the AWS environment, continuously synchronize MySQL and the image archive, then use a short controlled cutover with a tested rollback path. I recommend RDS for MySQL unless an application constraint requires the database on EC2; it provides better failover, backups, and operational reliability. I will assess the PHP application, database size, image volume, traffic patterns, and image-write paths. Terraform will provision a multi-AZ VPC, public/private subnets, ALB with HTTPS redirect, EC2 Auto Scaling, IAM roles, encrypted S3, lifecycle rules, logging, monitoring, backups, and least-privilege security groups. Images will be copied with checksum validation, followed by incremental synchronization. Database replication or AWS DMS will keep changes current until cutover. The phased plan is discovery, AWS foundation, application and data migration, synchronization, load/security testing, cutover, and post-migration optimization. Deliverables will include the cutover checklist, reproducible IaC, OWASP scan remediation, performance/cost comparison, DR runbook, and rollback procedure. Relevant profile: https://www.freelancer.com/u/techplusintl To start, I need architecture access, repository details, database/image sizes, DNS control, traffic metrics, and an AWS account with scoped access. Thanks!
$800 USD in 15 days
8.3
8.3

You want PHP/MySQL scaling on EC2 behind an HTTPS load balancer, with old and new images in S3. The critical risk is database/image drift; I’ll use incremental sync, checksum reconciliation and a brief write pause for cutover. I’ll build the AWS environment; all I need to start is access to the current host and AWS account. Day 1: migration plan and baseline. Days 2–3: Terraform for VPC/subnets, IAM, security groups, EC2/ALB, SSL and encrypted S3 with lifecycle rules. Days 4–5: migrate MySQL to private RDS and switch image writes to S3. Days 6–7: load-test against current latency/page times, run an OWASP Top 10 scan and fix findings, then cut over. In 7 days you’ll have production, reusable regional templates, a cutover checklist, performance/cost report and rollback/DR plan; archive transfer time will be validated on day 1. Roughly how large is the image archive today? Sid Techno LLC
$950 USD in 7 days
7.9
7.9

Hi, I understand you need to move your PHP/MySQL camera platform and large image archive to AWS without data loss or long downtime. I will first review the current Linux setup, database, image paths, traffic, and backup process, then prepare a staged migration and cut-over plan. I will build the EC2, S3, VPC, subnets, IAM, security groups, HTTPS, load balancer, lifecycle rules, and monitoring through repeatable Terraform or CloudFormation scripts. I will migrate and verify the SQL data and image links together, test performance under load, run OWASP checks, and provide cost, rollback, and DR documents. What are the current database and image archive sizes, AWS region, traffic peaks, and maximum acceptable downtime for cutover? Which AWS region, current hosting setup, database size, image archive size, and acceptable maintenance window should I use for the migration plan? Please start chat and let’s discuss the current architecture and timeline.
$1,350 USD in 14 days
7.1
7.1

Hello!, This is James from Hollywood... The main risk here isn’t just moving a PHP/MySQL platform, it’s keeping the camera site stable, preserving every image path, and avoiding downtime or broken archive links during the AWS migration. I’d handle it in clear phases: 1) Audit the current server, DB, image structure, and backup status 2) Design the AWS setup with Linux, SSL, S3, backups, and Terraform 3) Migrate MySQL, PHP app, and large image archive safely 4) Test URLs, permissions, performance, and restore/rollback 5) Cut over with minimal downtime and monitor after launch I’ve done similar migrations where the priority was reliability, data integrity, and a clean handoff. I pay close attention to the details that usually cause problems later, especially file permissions, image delivery, and backup recovery. Relevant work: - PHP/MySQL archive platform migration to AWS - Media-heavy SaaS move with S3 storage and SSL rollout - Terraform-based cloud rebuild for a production dashboard Quick questions: 1) Should the image archive be public on S3 or private behind the app? 2) Do you want zero downtime, or is a short maintenance window okay? 3) Is there already an AWS setup, or should I build it from scratch? If you want, I can first outline the migration plan so you know exactly how I’ll protect the data and keep the platform running smoothly.
$1,250 USD in 5 days
6.8
6.8

Migrating your PHP/MySQL camera platform to AWS is a critical step for handling those growing traffic and storage needs. I see that maintaining zero data loss and minimal downtime during this transition is paramount. And one common pitfall in such migrations is making sure that database changes are synchronized with the application layer, especially when moving large datasets. I’ll implement a strategy that keeps everything in sync from day one, avoiding any discrepancies. My approach involves re-architecting the stack on EC2, while using S3 for your image archive, using Terraform for Infrastructure-as-Code to automate the setup. I’ll integrate security the right way throughout the process, so your environment is secure from the start. I’m ready to provide a documented migration plan, deployment scripts, and a performance report post-migration, just to make sure everything is clear. I’m ready to get started on this right away, I mean, it’s an exciting project! Rajavel | AWS | PHP | MySQL
$1,099 USD in 10 days
6.8
6.8

Being experienced in transforming PHP/MySQL-based platforms into scalable, cloud-based solutions, my team at SoftwareLinkers is well suited to handle your AWS Migration project. Our broad skillset encompasses Linux, MySQL and PHP, along with complementary knowledge in other industry-related solutions – guaranteeing a comprehensive approach to your needs. We understand that scalability issue you are facing are adversely affecting your platform's performance and limiting its potential growth. Through meticulous re-architecture, we will ensure that your application servers run seamlessly on Amazon EC2 while your image archive is effortlessly stored on Amazon S3 - providing you with the requisite scalability, durability and cost-effectiveness. Additionally, we are well acquitted with building robust security features like VPC, subnets, IAM roles etc., further ensuring that your platform is protected.
$1,000 USD in 14 days
6.5
6.5

Hello, I'm Denis, a full-stack developer. I've successfully migrated PHP and MySQL applications to AWS, moving application code and large data archives while minimizing downtime. Your camera platform needs to move to AWS to handle growing traffic and storage without hitting current limits. The archive size and zero data loss requirement are the key constraints. Here's my approach: First, I'll document your current setup and build a detailed cut-over plan together. Then I'll provision AWS infrastructure using Terraform—EC2, S3, VPC, security groups, and load balancer—with encryption and IAM roles built in. Next, I'll migrate the MySQL database, test the application, and migrate your image archive to S3 in parallel. Before cut-over, I'll run load tests to verify performance meets or exceeds current hosting. Finally, I'll create deployment scripts for scaling to additional regions. The critical challenge is keeping the database and image archive perfectly synced with zero data loss. I'll take clean snapshots of both, migrate them together, run verification to confirm every image and database record matches, then switch traffic. The main risk is undocumented dependencies in your current setup, which I'll mitigate through thorough auditing and testing before production cut-over. I'm ready to start immediately. Let's discuss the details. Thanks, Denis.
$750 USD in 10 days
6.2
6.2

noticed your requirement and here is my understanding - Migrate a high-traffic PHP/MySQL camera platform and large image archive to a scalable, secure, and automated AWS architecture. PHP, MySQL, AWS EC2, S3. I've gone through your requirement for camera platform and large image archive migration. I can build this with your preferred stack - PHP, MySQL, AWS EC2, S3 - with clean, scalable codebase within 7 days. Milestone 1: Infrastructure Provisioning & Database Migration Deploy secure VPC networking via Terraform, configure EC2 instances behind an HTTPS-terminated Elastic Load Balancer, establish IAM roles, and execute zero-downtime database migration alongside initial image archival to encrypted S3 buckets with lifecycle policies. Milestone 2: Application Integration, Security & Performance Tuning Integrate the PHP application with S3 storage, execute comprehensive load testing to optimize MySQL latency, perform OWASP Top-10 security validation, and deliver automated deployment scripts, disaster recovery strategies, and post-migration performance reports. Let's review target timelines and map core milestones. I may have few questions before suggesting full architecture. Lets hit CHAT and discuss now ! Gaurav P. 15 yrs experience in debugging systems :)
$999 USD in 15 days
6.4
6.4

Your image archive can sync to S3 while the old host keeps serving it, so cut-over stays short. Week one after award delivers the plan, cut-over checklist and Terraform for networking, EC2 and S3. IAM roles, security groups and S3 encryption live in those templates, so a new region is one run. Week two builds staging, syncs the archive with lifecycle rules and load-tests against current hosting. PHP sessions or uploads on local disk break behind a load balancer, so they move to S3 and Redis. Week three is cut-over after a final MySQL sync, then the OWASP scan and cost, rollback and DR report. You review the plan and templates before production changes. How many terabytes is the archive?
$1,000 USD in 7 days
6.1
6.1

hello, The piece that decides a smooth cut-over is the image archive, because it's large and constantly growing, so you can't just copy it once and switch. If images are copied to S3 on Friday and the platform keeps writing new ones until Monday's cut-over, those new images are missing in AWS. So I'd migrate the archive in two passes, a bulk sync first, then a final delta sync of everything added since, at cut-over, which is exactly how you hit your zero-data-loss and minimal-downtime criteria. I'd also refactor the app to read and write images directly to S3 going forward, not local disk, since that's the real scalability win. The database needs the same care: I'd use replication so the AWS MySQL stays live-synced with production right up to cut-over, keeping downtime to minutes, not hours. Everything built as Terraform from day one, VPC, subnets, IAM, encrypted S3, ALB with HTTPS only, so you can reproduce it in new regions as you want. Roughly how large is the image archive, and how many new images per day? And is the database staying on EC2 MySQL, or open to RDS for easier scaling and backups? have a nice day.
$1,250 USD in 40 days
6.1
6.1

Hi, I can migrate your PHP/MySQL camera platform to AWS with zero data loss and minimal downtime. With 9+ years of experience and 470+ completed projects, I handle EC2, S3, Terraform, and security-first architectures. Here's how I can help: ● Re-architect with EC2 behind Elastic Load Balancer and move the image archive to S3 with lifecycle policies ● Migrate application and database together, keeping platform and archive in sync ● Build VPC, subnets, IAM roles, security groups, encrypted S3, and SSL termination from the start ● Provide Terraform or CloudFormation templates for repeatable multi-region deployment ● Deliver migration plan, cut-over checklist, load testing, OWASP scan, and rollback strategy Could you confirm your image archive size and acceptable downtime window? Which AWS region do you prefer? Let's chat to outline phases and timeline.
$1,200 USD in 12 days
5.9
5.9

Hi, I see you're tackling a significant transition by moving your PHP/MySQL-based camera platform to AWS, focusing on scalability to handle peak traffic and storage demands. This shift to Amazon EC2 and S3 is crucial for robust performance and cost efficiency. The key technical challenge here is ensuring a seamless migration without disrupting your current operations. My approach involves first clarifying the full scope of your current architecture, then methodically re-architecting the stack for AWS. This includes cleanly setting up EC2 for your application servers and S3 for your image storage, followed by thorough testing to ensure a smooth transition and optimal performance. I've successfully completed similar migrations, leveraging my skills in PHP and Linux to ensure minimal downtime and maximum reliability. Q1 – What is the current size of your image archive that needs to be migrated to S3? Q2 – Are there any specific AWS services you plan to integrate beyond EC2 and S3? Q3 – Do you have a preferred timeline for the migration completion? Happy to walk through the best approach once I have those details.
$750 USD in 7 days
5.8
5.8

**Free right now and can start your AWS migration plan today** I am Anand and PHP/MySQL to AWS moves are right in my lane. Recent work: migrated a PHP/MySQL media platform to EC2 and S3 with zero data loss, moved a 2TB image archive to S3 for a retail client with lifecycle rules and CloudFront. My approach: Re-architect: EC2 app tier behind an Elastic Load Balancer, S3 for all historical and new images, RDS MySQL, VPC with public and private subnets, IAM roles, tight security groups, encrypted S3 buckets, and SSL termination for HTTPS only. Migrate: app and database together using DMS/rsync and S3 sync with checksums so platform and archive stay in sync, tested cut-over with minimal downtime. Build: security in from phase one, not bolted on later, plus a load test to prove database latency and page-load times match or beat your current host, and an OWASP top-10 scan before go-live. Provide: Terraform scripts for EC2, S3, networking, ELB, RDS, and auxiliary resources so you can reproduce this in other regions fast. Deliverables I will hand over: documented migration plan with cut-over checklist, fully tested production environment, post-migration performance and cost report, and rollback/DR strategy. Timeline: plan and audit 3-4 days, Terraform build 5-7 days, migration and testing 5-7 days, cut-over and reporting 2-3 days. Shall I start with a quick audit of your current server and image archive size this week?
$880 USD in 7 days
5.8
5.8

I can help migrate your PHP/MySQL camera platform to AWS with scalability, security, and operational repeatability built in from the outset. My approach would be to begin with an inventory and dependency review, followed by a documented migration and cutover plan. I would design a secure VPC with private networking where appropriate, IAM least-privilege access, security groups, HTTPS termination, encrypted S3 storage, and lifecycle policies for the image archive. The application would be deployed on EC2 behind an Elastic Load Balancer, while the database and image migration would be coordinated to preserve consistency and minimize downtime. I would create Terraform or CloudFormation templates for the environment, deployment, monitoring, and future regional replication. Before cutover, I would validate functionality, load performance, OWASP Top 10 exposure, backup/restore procedures, and rollback readiness. Deliverables would include the migration checklist, infrastructure code, deployment documentation, performance and cost analysis, and a practical DR strategy. The work can be organized into assessment, architecture, infrastructure build, staged data/application migration, testing, cutover, and post-migration optimization phases. I would prioritize zero data loss and measurable performance parity throughout.
$750 USD in 5 days
5.4
5.4

Hello, I can migrate your PHP/MySQL camera platform to AWS using a phased approach that minimizes downtime while ensuring the image archive remains accessible. I’ve moved a similar PHP/MySQL application to AWS for a client, using RDS for the database and S3 for media storage—reduced their page load times by 30% after optimization. I’d approach this by setting up EC2 for the app, RDS for the database, and S3 for images, then migrating data in batches to avoid downtime. I’ll also configure CloudFront for faster image delivery and set up automated backups for both the database and S3. The biggest improvement will come from optimizing the image storage in S3 with lifecycle policies and using RDS read replicas to handle traffic spikes. Migrating to AWS will let you scale the platform dynamically, handling peak traffic without manual intervention. I’ll provide detailed Terraform scripts for the entire setup and a rollback plan in case of issues. After migration, I’ll monitor performance and optimize further if needed. Once the migration is done, I’ll review the setup with you and provide documentation for future updates. If this approach aligns with your goals, I’d be happy to discuss the timeline and next steps. Thanks, Lazar.
$750 USD in 3 days
5.2
5.2

Hi, I can help plan and execute your PHP/MySQL migration to AWS with a focus on scalability, security, and minimal downtime. I’ll use EC2, S3, load balancing, secure networking, and Terraform or CloudFormation to build a reproducible infrastructure. My approach includes database and image migration, data integrity verification, HTTPS configuration, lifecycle policies, load testing, security checks, and a documented rollback and disaster recovery plan. Estimated timeline: 2 weeks, depending on archive size, application complexity, and testing requirements. I’d first assess your current architecture and storage volume to define a safe migration and cutover strategy. Best regards, Shakila Naz
$800 USD in 14 days
5.4
5.4

The constraint here is migrating the existing PHP/MySQL platform and its large image archive to AWS. I will re-architect the application servers to run on Amazon EC2 instances, provisioning them with appropriate instance types for the load, and configure the database to run on Amazon RDS for managed database operations. The archived images will be moved to Amazon S3 buckets, with versioning enabled for data protection. I will use Terraform for Infrastructure-as-Code to manage the entire AWS environment, including setting up VPCs, subnets, IAM roles, and security groups to enforce security best practices from the start. Automated deployment scripts will be built into the Terraform configuration. I am assuming the existing PHP application code is reasonably modular and can be deployed without major refactoring to EC2. What is the expected daily growth rate of the image archive? Preferred Freelancer here, 5.0 over 10 reviews, no missed deadline and nothing over an agreed price yet. I need access to your current hosting environment details.
$1,350 USD in 21 days
4.8
4.8

The main risk in this migration is keeping the PHP application, MySQL records, and a large image archive consistent through cutover—not simply moving files to EC2 and S3. The migration needs a verifiable transfer and a rollback path so traffic can move without leaving image references or database changes behind. I’d keep the initial delivery focused on a reproducible AWS environment and a controlled migration. Terraform can define the VPC, subnets, EC2 instances, load balancer, S3 bucket, security groups, IAM permissions, and supporting resources. HTTPS would terminate at the load balancer, with access to instances and storage restricted by role and network policy. For the database, I’d confirm the current MySQL setup and operational constraints before choosing its AWS placement rather than assume a database design that may not fit the platform. For the archive, I’d plan the copy around application references and metadata, then validate transferred objects and database consistency before cutover. Deployment and migration scripts should be repeatable; the cut-over checklist should cover a final sync, smoke tests, traffic switch, and rollback conditions. I’d also configure S3 lifecycle and encryption policies, backups, and a documented recovery approach. Load testing and security checks can then identify issues to resolve before treating the new environment as production-ready. To keep the work efficient, I’d prioritize the infrastructure and migration path first, then use the test results to guide tuning and the cost/performance report. I’ll keep the Terraform and operational notes clear enough for your team to reproduce the setup in another region, and provide changes as clean, documented deliverables. How are the MySQL database and image references currently structured, and do you have an existing backup or maintenance-window process for the final synchronization?
$980 USD in 5 days
4.8
4.8

EBX, United Arab Emirates
Payment method verified
Member since Apr 23, 2012
$30-250 USD
$250-750 USD
$30-50 USD
$250-750 USD
$10-15 USD
$30-250 USD
₹1500-12500 INR
$250-750 USD
$30-250 USD
$10-30 USD
₹12500-37500 INR
₹600-1500 INR
$10-30 USD
$10-30 CAD
$250-750 AUD
$250-750 USD
$8-15 USD / hour
₹600-1500 INR
₹37500-75000 INR
$250-750 SGD
$15-25 AUD / hour
₹12500-37500 INR
₹600-1500 INR
£250-750 GBP
₹1500-12500 INR