
Closed
Posted
Paid on delivery
For manufacturing plant and I’m looking for your expertise to cut the material and energy waste that creeps in during the core manufacturing process. My immediate goal is to pinpoint every non-value-adding step on the shop floor, quantify the associated losses, and then turn those findings into a practical, time-phased improvement plan we can start rolling out within the next quarter. Here’s what I need from you: • A rapid diagnostic of our current flow, using Lean, Six Sigma or comparable toolsets—value-stream mapping, root-cause analysis, SPC, OEE, whichever combination gets us the cleanest data. • A clear waste baseline: percentage losses, scrap tonnage, rework hours, and the cost these represent. • A concise improvement roadmap that ranks actions by impact, effort and ROI and identifies where external subcontractors (e.g., equipment re-tooling, recycling or automation specialists) will add the most value. • Coaching sessions with my line supervisors and engineers so they understand the “why” behind every recommendation and can sustain the gains after you hand over. I’ll supply production data, videos of the line, quality logs and any maintenance reports you request. Most collaboration can happen remotely; if an on-site visit becomes necessary we can schedule that after the initial analysis. Acceptance criteria 1. Diagnostic report delivered in PDF plus all supporting spreadsheets. 2. Baseline metrics reviewed and signed off by our operations manager. 3. Roadmap with prioritized actions, target % waste reduction, and an implementation timeline. 4. Two virtual training workshops recorded for future reference. If this matches your expertise, let’s talk timing and milestones so we can get started.
Project ID: 40209806
6 proposals
Remote project
Active 11 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
6 freelancers are bidding on average ₹31,875 INR for this job

As a Software Engineer with over a decade of experience in data analysis and project management, I believe I'm the ideal fit for your need to cut material and energy waste in your manufacturing process. My repertoire includes expertise in Lean, Six Sigma and other data analysis tools that can help us find every non-value-adding step on your shop floor — from value-stream mapping to root-cause analysis, SPC, OEE and so on. I understand the importance of quantifying losses and turning findings into practical, time-phased improvement plans. Over the years, I have developed strategies to not only identify waste but also rank solutions by their impact, effort and ROI. This will enable me to provide you with a concise improvement roadmap targeting different aspects of your manufacturing process. Having managed a variety of projects and provided virtual coaching and training numerous times before, I can effortlessly execute most of our collaboration remotely. Should an onsite visit become necessary, rest assured it will be scheduled at your convenience after the initial analysis is complete. Together, let's streamline your plant's manufacturing process leaving no room for unnecessary waste.
₹25,000 INR in 3 days
1.2
1.2

Hello, I’ve gone through your project details, and I am confident I can assist you in reducing material and energy waste in your manufacturing process. With 10+ years of experience in manufacturing consultancy, particularly applying Lean and Six Sigma methodologies, I specialize in pinpointing non-value-adding steps. I will conduct a rapid diagnostic to create a clear waste baseline and develop a concise improvement roadmap tailored to your needs. My approach ensures impactful, data-driven actions ranked by potential ROI while incorporating coaching sessions for your supervisors and engineers to enhance long-term sustainability. Here is my portfolio: https://www.freelancer.in/u/ixorawebmob I’m eager to learn more about your project and discuss how we can kick off this initiative effectively. Could you clarify: What specific timeline do you have in mind for the completion of the diagnostic report and implementation plan? Let’s discuss over chat! Regards, Arpit Jaiswal
₹27,750 INR in 1 day
0.0
0.0

I propose a 7-day rapid diagnostic project to identify, quantify, and prioritize waste reduction opportunities in your core manufacturing process, delivering a clear, data-driven action plan. Methodology 1. Value Stream Mapping (VSM): Map material and information flow to identify non-value-added activities. 2. Quantitative Loss Baseline: OEE: Availability × Performance × Quality. Material Waste: % Scrap = (Input Weight – Good Output Weight) / Input Weight. Cost of Loss: Convert scrap, rework hours, downtime, and energy use into financial impact (₹). Root Cause Analysis: Pareto and 5-Whys on top loss drivers. Action Prioritization: Effort vs Impact matrix and ROI = (Annual Savings – Cost) / Cost. 2. Deliverables (7 Days) Diagnostic Report (PDF) with current-state VSM and baseline metrics (OEE, % Scrap, Cost of Waste). Prioritized Improvement Roadmap (Excel/PPT) covering quick wins, mid-term improvements (e.g., SMED, equipment tuning subcon), and strategic options (automation/recycling based on ROI). Two recorded coaching sessions to transfer knowledge and support sustainability. This approach ensures recommendations are numerically justified, financially transparent, and operationally executable, enabling fast and informed decision-making
₹36,000 INR in 15 days
0.0
0.0

Hi, As a operation and production professional with 18 years of experience in manufacturing excellence, I specialize in waste elimination, process optimization, and Lean-driven improvements in production environments (leadership roles at Luminous Power, Uno Minda, Napino). I’m currently working as a freelance consultant and this project aligns perfectly with my expertise: Rapid shop-floor diagnostics using Lean tools (value stream mapping, root-cause analysis, OEE, cycle time studies, defect analysis) Quantifying non-value-adding losses (scrap %, rework hours, energy/material waste, cost impact) Creating prioritized, ROI-based roadmaps with phased implementation plans and subcontractor recommendations (e.g., automation, re-tooling). I can deliver remotely: Diagnostic report + supporting spreadsheets Baseline metrics for sign-off Concise roadmap with % reduction targets and timeline Let’s discuss and get your waste reduction plan rolling out immediately. Best regards, Sandeep L. Freelance Manufacturing Excellence Consultant | Lean & Process Optimizer Haridwar, India
₹40,000 INR in 10 days
0.0
0.0

Gurgaon, India
Member since Nov 3, 2019
₹12500-37500 INR
₹12500-37500 INR
min €36 EUR / hour
₹150000-250000 INR
£250-750 GBP
£18-36 GBP / hour
₹600-1500 INR
$1500-3000 CAD
₹600-1500 INR
$15-25 USD / hour
$600-1500 USD
min ₹2500 INR / hour
₹1500-12500 INR
₹600-800 INR
₹5000-15000 INR
£20-250 GBP
₹12500-37500 INR
₹1500-12500 INR
$250-750 USD
$25-50 AUD / hour
₹5000-20000 INR
$1500-3000 AUD