Annulé

SCADA application decoding

I need your help. Presently Iam working one of the project.

Existing system SCADA is factorylink 8.0 which is working as gateway between AB PLC (around 90 nodes) and Other OPC’s. Factorylink clients having graphics (FLAP) used for monitoring.

we wanted to decode the graphics (project database) to any other SCADA system since factorylink application declared as absolute wef 2012

I can arrange FLAP project back up or full system back-up.

let me know through avmohd at gmail dot com

Compétences : PLC & SCADA

Voir plus : factorylink, plc, scada system, presently working project, wanted gmail, application monitoring, plc project scada, factorylink scada, monitoring system project, gmail application, scada plc project, nodes, gmail monitoring, monitoring application, gmail database, monitoring gmail, graphics application, absolute database, plc scada project, project plc scada, gmail wanted, application wanted, ab plc, database plc, application opc

Concernant l'employeur :
( 0 commentaires ) Abu Dhabi, United Arab Emirates

N° du projet : #1630274

1 freelance a fait une offre moyenne de 30 $ pour ce travail

TopGunPk

Hired by the Employer

30 $ USD en 30 jours
(1 Commentaire)
4.1