En cours

Information System Final Installation and Support Plan

Need someone to write an Final Installation and Support Plan Report based on a case study. I have attached the case study along with a briefing outlining the main guidelines that should be followed to produce the report. Please read it carefully before posting. With this I also need a detailed Project gantt chart with all the relevant project dates. I also need this done urgently 2-3 days tops as my deadline is on the 6th may, this Friday. Hired someone here to do this project fro me over three weeks ago and can't or wouldn't deliver up to now. I don't know whats happening with him. any way please see the attached documents and get back to me as soon as possible.

Thanks.

Compétences : IIS, Rédaction de Rapport, Recherche, Rédaction scientifique, Rédaction Technique

Voir plus : installation support plan, final installation support plan, information system support plan, final installation support plan report, installation support plan system, installation support plan report, support plan information system, final installation support plan done, writing dates, whats technical writing, report writing system, report writing guidelines, i need technical support, hired research, get hired to write, installation support plan final case study, gantt project, whats up, Tops, t write a technical report, need someone to write a technical report, it technical support, information system, gantt, report chart

Concernant l'employeur :
( 6 commentaires ) Penal, Trinidad and Tobago

N° du projet : #1044503

3 freelancers are bidding on average $133 for this job

dmjuma

I am interested in working with you again.Thanks.

150 $ USD en 3 jours
(303 Commentaires)
7.3
trinitrotoluene

Hi, Pls check your message area

150 $ USD en 4 jours
(0 Commentaires)
0.0
rajshekharit

Please check your PM

150 $ USD en 2 jours
(0 Commentaires)
0.0
electrosoft1

i want to this project and show my skills.

100 $ USD en 4 jours
(0 Commentaires)
0.0