Construction Inspection Checklist: Earthwork

I need inspection form checkpoints for:

Earthworks - Division 31 (One of a series of general contracting inspection forms)

1) 31 11 00 Clearing and Grubbing

2) 31 22 00 Grading

3) 31 23 00 Excavating and Fill

4) 31 62 00 Driven Piles

5) 31 63 00 Bored Piles

6) 31 64 00 Caissons

+The should be 5-15 checkpoints per section, with a total of 60 checkpoints.

+Checkpoints should reflect items for heightend awareness based on the writer's experience of frequency and severity of defects forund during construction operations.

+Document should be a Microsoft Word table or Excel spreadsheet.

+Must be original work. I already have all the usual books!

Compétences : Génie Civil, Suivi de Construction, Gestion de Projet

en voir plus : earthwork inspection checklist, construction inspection checklist, earthworks checklist, checklist earthwork, inspection checklist construction, earthworks inspection checklist, construction inspection forms, earthwork checklist, construction inspection checklist form, checklist earthworks, earthwork inspection forms, construction inspection table form, inspection checklist earthwork, earthwork construction checklist, earthwork construction inspection checklist, construction inspection checklist earthwork, construction defects checklist, earthworks inspection, construction checklist, earthworks construction inspection forms, inspection form earthwork, section caissons, construction inspection checklist form earthworks, checklist earthwork form, earthwork construction

Concernant l'employeur :
( 25 commentaires ) 21114, United States

Nº du projet : #1035217

Décerné à:


Please see PM.

%selectedBids___i_sum_sub_7% %project_currencyDetails_sign_sub_8% USD en 2 jours
(9 Commentaires)

7 freelance font une offre moyenne de $149 pour ce travail


Please check your PM box. Thank you .

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 2 jours
(17 Commentaires)

Please check your PM box. Thank you !!

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 2 jours
(8 Commentaires)

I have done something similar in malaysia

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 3 jours
(0 Commentaires)

dedication to task is the only solution

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 3 jours
(0 Commentaires)

I am ready to give

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 3 jours
(0 Commentaires)

Experienced field engineer.

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 3 jours
(0 Commentaires)