There will be a short-term project in November from 13.11.2017.
Task – swapping over older POS stations for the newer models (Approx duration - 3 hrs per location, 8.00am onwards)
Experineced on POS stations
He must have complete cisco toolkit along with lan tester, patch cables.
Number of shops / location split = SWEDEN
On average per day there are 3-4 locations. Installation instructions will be provided in each store as these are packed with the hardware goods, also will be shared on the external drive for quick access.