
Open
Posted
•
Ends in 6 days
Paid on delivery
# Industrial Engineering Research & Excel Modelling – Manufacturing Shift Systems and Four-Day Work Week ## Project Overview I am looking for an experienced Industrial Engineer, Operations Research Specialist or Manufacturing Systems Analyst to assist with a research and modelling project examining the operational and economic implications of introducing different four-day working week models in manufacturing environments. The project focuses on understanding how alternative working-time arrangements affect production capacity, workforce requirements, staffing levels and labour costs. The research framework, proposed scenarios and general modelling approach have already been established. I am looking for someone with practical experience in manufacturing operations and quantitative analysis to help develop the model, validate the calculations and conduct the scenario analysis. ## Research Objective The main objective is to evaluate under which manufacturing conditions different four-day working week arrangements are operationally and economically feasible compared with conventional five-day working arrangements. The analysis will focus on two manufacturing environments: 1. **Two-shift manufacturing plant:** Two 8-hour shifts operating five days per week (80 operating hours). 2. **Continuous manufacturing plant:** Three-shift operation covering 24 hours per day, seven days per week (168 operating hours). ## Scenarios to Be Analysed The project will compare four working-time arrangements: - **Baseline:** Conventional five-day working week with 8-hour shifts. - **Scenario 1 – Compressed working week:** Four 10-hour working days, maintaining the same weekly contractual hours. - **Scenario 2 – Reduced working week:** Four 8-hour working days, reducing weekly contractual hours to 32. - **Scenario 3 – Rotating shift arrangement:** Four days on / four days off, using 12-hour shifts for continuous manufacturing operations. The scenarios should be evaluated against the baseline to understand their operational and economic implications. ## Required Modelling Work The main deliverable is a structured Excel-based scenario model. The model should include: **1. Workforce and Staffing Requirements** - Calculate the required workforce for each operating arrangement. - Estimate the number of employees and crews needed. - Account for contractual weekly working hours. - Incorporate absence allowances, including sickness, leave and training. - Assess staffing requirements for different shift structures. **2. Production Capacity Analysis** - Calculate available operating hours. - Estimate effective production capacity. - Incorporate machine availability and productivity assumptions. - Evaluate the impact of reduced working hours and longer shifts on production output. - Identify potential capacity shortfalls. **3. Labour Cost Analysis** - Calculate weekly labour costs under each scenario. - Evaluate the effect of additional staffing requirements. - Consider different compensation arrangements. - Calculate labour cost per unit of production. **4. Break-Even Analysis** - Determine the productivity improvement required for each alternative working arrangement to achieve the same labour cost per unit as the baseline. - Compare the required productivity improvements against published research findings. **5. Sensitivity Analysis** The model should allow different assumptions to be tested, including: - Employee absence rates. - Productivity changes. - Machine availability. - Production demand. - Fatigue-related productivity adjustments. - Labour cost and compensation assumptions. Low, medium and high scenarios should be considered where appropriate. **6. Operational Feasibility Assessment** Develop a comparison framework evaluating each arrangement according to: - Production capacity. - Workforce requirements. - Labour cost per unit. - Overtime requirements. - Legal and working-time constraints. - Fatigue and operational risks. ## Research and Literature The modelling work should be supported by relevant academic literature and credible industry sources covering: - Four-day working week models. - Compressed and reduced working schedules. - Manufacturing shift systems. - Workforce planning and capacity management. - Productivity under extended working hours. - Fatigue and occupational safety. - Labour costs and operational efficiency. Some preliminary academic references and research directions have already been identified. The purpose is not simply to produce calculations, but to ensure that the assumptions and model parameters are supported by credible research. ## Expected Deliverables 1. A functional and clearly structured Excel scenario model. 2. Documented formulas, assumptions and input parameters. 3. Comparative results for the two manufacturing environments. 4. Workforce, capacity and labour cost calculations. 5. Break-even productivity analysis. 6. Sensitivity analysis. 7. Relevant charts, tables and visual comparisons. 8. A short technical explanation of the modelling methodology and findings. The Excel model should be transparent, reusable and easy to modify by changing input assumptions. ## Ideal Freelancer Profile I am particularly interested in working with someone who has experience in: - Industrial Engineering. - Manufacturing systems and production planning. - Operations Research. - Workforce and shift scheduling. - Capacity planning. - Excel modelling and quantitative analysis. - Cost and productivity analysis. Experience with manufacturing simulation software or optimisation techniques would be beneficial, but the primary modelling environment will be Microsoft Excel. ## Important Project Considerations The research scope and scenarios are already defined. I am looking for someone who can understand the operational problem, help translate the research framework into a technically sound model, and produce reliable analytical results. The work should be developed progressively, with the modelling logic and assumptions explained so that the methodology and results can be understood and independently presented.
Project ID: 40801360
5 proposals
Open for bidding
Remote project
Active 9 secs ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
5 freelancers are bidding on average €470 EUR for this job

Hi, I understand you need a reusable Excel model comparing five-day and four-day manufacturing schedules across two-shift and continuous plants. I will build clear input, calculation, scenario, sensitivity, and results sections covering crews, absence allowances, operating hours, capacity, productivity, labour cost per unit, overtime, break-even productivity, and operational risks. I will keep the formulas transparent and document the assumptions so the model can be checked, adjusted, and presented independently. I can also connect the main assumptions with credible research on shift systems, fatigue, productivity, and working-time arrangements. Microsoft Excel will be used as the main modelling environment, with Engineering and Simulation logic applied to test low, medium, and high cases. Do you already have plant-specific data for staffing, absence, productivity, machine availability, wages, and demand, or should the model begin with research-based assumptions? Please start the chat and let’s discuss the input data, preferred assumptions, and model structure.
€650 EUR in 14 days
6.5
6.5

I can turn your manufacturing shift research into a transparent Excel model that compares the baseline, compressed week, reduced week, and rotating shift scenarios across both plant types. The result will show workforce needs, production capacity, labour cost per unit, break-even productivity, and a clear feasibility comparison aligned with your research scope. I will build the calculations from credible sources and clearly defined assumptions, then check the logic across staffing, absences, machine availability, fatigue effects, and cost inputs. I will also document the formulas and assumptions so the workbook is easy to review, test, and update, and I can add any literature-backed parameters you want included if you share your preferred references. Best, Sonia
€250 EUR in 1 day
4.3
4.3

Hello, I’m Abdul Mannan, a software developer based in Canada with experience in structured data analysis and technical problem-solving. I can help translate your research framework into a transparent, reusable Excel model, with configurable assumptions, documented formulas, scenario comparisons, sensitivity analysis, and clear charts. I would structure the workbook around the two manufacturing environments, keeping workforce requirements, operating hours, production capacity, labour costs, and break-even calculations separately traceable. I’d also build in adjustable absence, productivity, machine availability, and compensation inputs so the results can be tested under low, medium, and high assumptions. One important point: I’m not a qualified industrial engineer and don’t have verified manufacturing shift-planning research projects to present. I can contribute to the Excel modelling and analytical implementation, but the operational assumptions and engineering conclusions should be validated by a manufacturing specialist. Would you already have the academic references and baseline input data available? Thank you.
€250 EUR in 7 days
0.0
0.0

I recently assisted a manufacturing client evaluate shift arrangements for improved productivity, enabling them to make informed decisions. I can help you compare four-day work week models, ensuring you understand their operational and economic implications. Understanding the nuances of workforce requirements, production capacity, and labor costs is crucial for your analysis. Your focus on two manufacturing environments will benefit from precise calculations in Excel, accounting for factors like staffing levels, machine availability, and productivity changes. I have over 6 years of experience in industrial engineering and Excel modeling. I'm new to Freelancer, so my pricing is flexible while I build my reviews. I can deliver a robust, transparent model in about 2 to 4 weeks, ensuring all assumptions are documented clearly. Let’s make those calculations as smooth as a well-oiled machine. What specific metrics are you most interested in analyzing first? Regards, Joshua.
€550 EUR in 7 days
0.0
0.0

berlin, Germany
Payment method verified
Member since Dec 18, 2024
€8-30 EUR
€30-250 EUR
€250-750 EUR
€8-30 EUR
€10-150 EUR
£250-750 GBP
₹12500-37500 INR
$250-750 USD
₹12500-37500 INR
$30-250 AUD
$30-250 NZD
$10 USD
₹1500-12500 INR
$10-30 USD
₹37500-75000 INR
$250-750 CAD
£18-36 GBP / hour
$15-25 USD / hour
₹1500-12500 INR
$15-25 USD / hour
₹12500-37500 INR
₹12500-37500 INR
min $50 USD / hour
$250-750 USD
₹12500-37500 INR