Fermé

promodel software

It is just a problem on promodel software which is used in simulation.

United Electronics manufactures small custom electronic [url removed, login to view] must be processed through four stations:assembly,soldering,painting and [url removed, login to view] arrive with an exponential interarrival distribution (mean 20 minutes).The process time distribution are:

ASSEMBLY UNIFORM(13.5,1.5)MINUTES

SOLDERING NORMAL (36,10)MINUTES

PAINTING UNIFORM(55,15)MIN

INSPECTION EXPONENTIAL(8)MINUTES

The soldering operation can be performed on three jobs at a [url removed, login to view] can be done four jobs at a [url removed, login to view] and inspection can be done on four jobs at a [url removed, login to view] a simulation model with [url removed, login to view] it for 100 days 8 hours each .Use an array to store process time information .Read this information fro external spread sheed to simulation model.

Compétences : Design industriel

Voir plus : promodel software, united jobs, soldering jobs, jobs in electronics, inspection jobs, industrial jobs, industrial design process, electronics design jobs, electronic design jobs, assembly process, united electronics manufactures small custom electronic assemblies parts, software jobs, painting jobs, 1.5 hours in minutes, jobs in animation, electronic jobs, uniform, soldering, create an operation, create uniform model, simulation model, hours simulation, industrial process animation, simulation design, operation normal operation

Concernant l'employeur :
( 0 commentaires ) United States

N° du projet : #1046005