
Fermé
Publié
Payé lors de la livraison
My infrastructure project is still on the drawing board, and before we break ground I need a seasoned quantity surveyor’s insight to keep the numbers realistic. At this planning and design stage your focus will be three-fold: solid cost estimation and budgeting, a clear-eyed feasibility study, and precise material quantity take-offs that the engineers can plug straight into their models. I can share preliminary design files and site data as soon as we start. You’re welcome to work in CostX, Cubit, Excel, or any other professional QS platform you prefer, provided the final documents are easy for my team to interrogate and update later. Deliverables I must receive: • A detailed cost breakdown with contingencies and stated assumptions • A feasibility report highlighting cost drivers, financial risks, and value-engineering options • A complete bill of quantities (BOQ) aligned with the latest drawings All figures should reference current market rates for labour, plant, and materials; if regional price data is used, cite the source. Accuracy and transparency are key—every line item should be traceable back to its measurement. If this scope matches your expertise, I’m ready to share the plans and set milestones so we can keep the design moving without budget surprises.
N° de projet : 40238774
24 propositions
Projet à distance
Actif à il y a 21 jours
Fixez votre budget et vos délais
Soyez payé pour votre travail
Surlignez votre proposition
Il est gratuit de s'inscrire et de faire des offres sur des travaux
24 freelances proposent en moyenne $108 AUD pour ce travail

As a seasoned professional with seven years of experience, I am deeply familiar with the vital roles cost analysis and quantity surveying play in successful infrastructure projects. My work spans over many sectors, including Metlife GOSC, DXC Technologies, and Elite Services, giving me diverse industry expertise tailored to suit your project's unique needs. To ensure maximum transparency and ease-of-use for your team, I'm proficient in various QS platforms like CostX, Cubit, Excel, which allows me to deliver documents precisely aligned with your project specifications. My commitment to accuracy is unmatched - every figure I provide is thoroughly cross-checked against the current market rates from reliable sources. Moreover, having developed a knack for completing complex tasks within tight schedules without compromising quality, I assure you that your project will not only meet but exceed expectations. An added benefit of working with me is my results-oriented approach; I am adaptable and ready to cater to any challenges that arise throughout the process. Let's connect to discuss your design moving forward without any nasty budget surprises.
$180 AUD en 3 jours
8,5
8,5

Hello, With over 7 years of experience in Excel, Financial Analysis, and Market Research, I am well-equipped to handle your project requirements effectively. I have carefully reviewed the project description and understand the need for a seasoned quantity surveyor to provide accurate cost estimation, feasibility study, and material quantity take-offs for your infrastructure project. To ensure the success of the project, I plan to utilize professional QS platforms such as CostX, Cubit, or Excel to deliver a detailed cost breakdown, feasibility report, and a comprehensive bill of quantities aligned with the latest drawings. I will reference current market rates for labor, plant, and materials, ensuring transparency and accuracy in every line item. I am confident in my ability to meet your project expectations and would like to discuss further details with you. Please connect with me for a more in-depth conversation. You can visit my Profile: https://www.freelancer.com/u/HiraMahmood4072 Thank you.
$100 AUD en 2 jours
6,1
6,1

Hello, I’m a professional Quantity Surveyor with strong experience supporting infrastructure projects at pre-construction stage, delivering accurate cost planning, feasibility analysis, and detailed BOQs that align directly with evolving design drawings. I can review your preliminary plans and site data to produce a transparent, fully itemized cost estimate with clear assumptions, contingencies, and traceable measurements, along with a feasibility report highlighting key cost drivers, financial risks, and practical value-engineering opportunities. Using tools such as CostX, Cubit, or Excel, I will ensure all quantities are precise and that labour, plant, and material rates reflect current regional market data with sources referenced. My focus is accuracy, clarity, and making sure your engineering team can easily interrogate and update the documents as the design progresses. I’m ready to begin as soon as you share the drawings and can structure milestones to keep your project moving forward with confidence and no budget surprises. Regards, Zafar
$100 AUD en 1 jour
6,2
6,2

Hi, there, I possess extensive experience in infrastructure projects, specializing in cost estimation, feasibility studies, and material quantity take-offs. Leveraging tools like CostX and Excel, I ensure accurate cost breakdowns, feasibility reports, and detailed bill of quantities aligned with the latest drawings. ✅ By analyzing current market rates, I provide transparent and traceable figures, mitigating financial risks and offering value-engineering options to keep the project on budget. ✅ Utilizing my expertise in financial analysis, project management, and risk management, I ensure the design progresses smoothly without budget surprises. ✅ With a focus on accuracy and transparency, I guarantee that every line item is backed by meticulous measurement. I look forward to working with you. Best Regards. Brayan
$200 AUD en 3 jours
5,3
5,3

Hi there, I am a Data Scientist, a professional responsible for providing comprehensive finance and accounting services tailored to meet your organization's operational and strategic needs. My approach combines industry best practices with a deep understanding of financial regulations and performance management to deliver accurate, timely, and transparent financial reporting. I offer end-to-end solutions, including accounts payable and receivable management, general ledger maintenance, budgeting and forecasting, payroll processing, tax compliance, and financial analysis. Leveraging a skilled team and modern financial tools, my aim to improve efficiency, ensure compliance, and support data-driven decision-making, all while reducing operational costs and risks. Also entrusting your sales data with someone who values precision and confidentiality. Let's begin working together on this valuable project to deliver lasting results that will positively impact your business. Thanks Gdev
$30 AUD en 7 jours
5,0
5,0

Hello There. ⇛My Philosophy is “Quality is never an accident it is always the result of an intelligent effort! Professional Multilingual Service Provider. Given the chance to be in long-term Cooperation! My certifications in QuickBooks, Xero and Advanced Excel ?️, I have acquired the necessary skills to deliver accurate financial reports and reconcile them for you. However, what truly sets me apart is my growth-focused mindset ?, that helps drive strategic decisions by turning data into actionable insights. ▶Expertise and Specialties is? & What Services I Provide? ✔️Excel ✔️DAX ✔️Python ✔️SQL ✔️Tableau ✔️Scraping ✔️PPT ✔️Google-Sheets ✔️Typing ✔️ Web Scraping ✔️Data Extraction ✔️Data collection ✔️Leads ✔️Spreadsheet - Formulas ✔️PDF-MS Expert ✔️power-BI specialist ✔️Functions ✔️Macros ✔️VBA ✔️Dashboards ✔️Graphs ✔️Charts ✔️Pivot tables ✔️Flow charts ✔️ODOO ✔️Data Analysis ✸ Google-sheets ✔️Data Processing ✔️ Please leave a message here in via chat box. Thank You!
$30 AUD en 1 jour
4,6
4,6

My name is "Usama Safdar" and I am a Ph.D degree holder which means I am highly-capable to tackle this project "Content Editor " with 100 percent accuracy. I am a professional writer with over 6 years of experience in writing; Essays, Research Summaries, Thesis, Dissertation, Lab Reports and Case Studies. I always provide High-Quality Solutions within the shortest possible time with all instructions followed against very reasonable prices. I can manage works even with shortest deadlines like; "2500 words work in just 6 Hours" with very reasonable time. As a pro academic writer I am also familiar with all the referencing styles; such as APA, Harvard, OSCOLA, IEE, MLA etc. I always provide plagiarism-free solutions and as a prove I also provide "FREE Turnitin reports". For Samples, please visit my profile https://www.freelancer.com/u/SolutionMart Please message me to start the discussion. Thank You
$30 AUD en 1 jour
4,3
4,3

Infrastructure Quantity Surveyor Needed I’m a professional writer with extensive experience crafting engaging, precise, and high-quality content across academic, professional, and creative fields. I specialize in delivering work that not only meets requirements but also resonates with the target audience. Every project I take on is handled with care, attention to detail, and originality. I ensure timely delivery while maintaining clarity, structure, and style tailored to your needs. I’d love the opportunity to bring your ideas to life and exceed your expectations. Best regards, GameOfWords!
$30 AUD en 1 jour
4,0
4,0

Freelance Quantity Surveyor – Cost Planning & Feasibility I’m a B.E. Civil Engineer with 9+ years of QS & estimation experience, including 5 years on large-scale projects in Saudi Arabia, supporting projects from concept stage through tender with accurate cost planning, BOQs, and value-engineering input. For your infrastructure project, I will deliver: ✔ Detailed cost estimate with rate build-ups, contingencies & clearly stated assumptions ✔ Feasibility report identifying key cost drivers, financial risks & practical VE options ✔ Measurement-based BOQ aligned with the latest drawings – every quantity fully traceable ✔ Current market rates for labour, plant & materials with cited data sources I’m proficient in planswift, Excel, and standard QS measurement methods, and structure outputs so your engineers can interrogate, update, and plug the data directly into their models. My approach focuses on realistic budgeting at the design stage to eliminate cost overruns before tender. Ready to start immediately Samples of similar pre-contract cost planning and infrastructure BOQs are available on request.
$180 AUD en 4 jours
3,6
3,6

HI 25 years’ experience | Solution: I will provide infrastructure quantity surveying with accurate take-offs, cost estimates, and organized Excel deliverables that support planning, bidding, and budgeting. ✅ Solution: Detailed infrastructure quantities with itemized breakdowns, unit rates, and clear calculation sheets tailored to your project scope. Questions: 1️⃣ Do you have plans, drawings, or PDFs I should base the survey on? 2️⃣ What measurement standards or codes should be followed (e.g., SMM, CESMM)? 3️⃣ Which output formats and breakdown levels do you require (Excel sections, summaries)? We will work as per Freelancer.com’s terms and policies. Warm regards, The Blend Nation
$140 AUD en 1 jour
3,4
3,4

Your infrastructure project at the drawing board stage is the critical phase where value engineering and precise cost modeling dictate long-term project success. Having managed pre-construction quantity surveying for major civil works, including large-scale site developments and utility networks, I specialize in transforming early-stage designs into rigorous, bankable cost plans. I understand the nuances of infrastructure procurement and the necessity of identifying potential budget overruns before construction commences, ensuring your financial projections are as solid as the engineering. My approach centers on a detailed elemental cost analysis and the development of a comprehensive Bill of Quantities (BOQ) aligned with CESMM4 or NRM2 standards. I utilize BIM-integrated estimation tools like CostX to ensure high-precision 5D cost modeling, allowing for seamless adjustments as design iterations occur. Beyond the BOQ, I will perform a sensitivity analysis on material price volatility and local labor indices to build a robust contingency framework. This proactive methodology ensures that the final budget accounts for the logistical complexities and site-specific risks inherent in heavy infrastructure development, providing a solid foundation for both investor confidence and the eventual contractor tendering process. To refine the initial estimate, do you currently have a finalized topographical survey, or are we working strictly from the preliminary CAD layouts at this stage? Additionally, are there specific environmental or procurement constraints already identified that might impact the mobilization costs or specialized equipment requirements? I am ready to analyze your drawings and provide a clear roadmap for your project’s financial viability. Let’s connect for a brief chat to align on your timeline and the specific deliverables required for this pre-construction phase; I am also available for a call if that helps clarify the project scope.
$165 AUD en 21 jours
2,6
2,6

With a project of this scale, the expertise that I offer as a data scientist and programmer might not be directly applicable, but the underlying skills I bring are precisely what is demanded here in terms of data management and strict adherence to detail. My proficiency in tools such as Excel is an asset for organizing, analyzing, and presenting your complex cost estimates and BOQ. My experience in setting up robust dataflows ensures that your financial risk analysis will be comprehensive and insightful. Moreover, my background in working with limited data necessitates exacting estimation and validation methods - a quality you can count on when preparing cost breakdowns. In addition to my skills in financial analysis and risk management, my adaptability to new software platforms will empower me to accommodate the technology your team uses during the project—whether it's CostX, Cubit or others. Lastly, let me assure you of my commitment to accuracy and transparency. My approach is to be meticulously thorough so that every line item provided in the deliverables can be traced back confidently. From a wider perspective, as an AWS-certified professional, I do have experience dealing with cost-effective deployment solutions, an overarching skill that could come in beneficial when navigating costs on this infrastructure project. Trust implies building a track record; allow me to amaze you with my precise work ethic for this undertaking!
$150 AUD en 3 jours
3,0
3,0

Hi there. I’ll help keep your infrastructure planning realistic with solid cost estimation, a crisp feasibility view, and precise BOQ take-offs so your engineers can plug results straight into models. I’ve led 8+ years of cost planning on large-scale infra with teams using CostX, Cubit, and Excel, delivering budgets that stay grounded as designs evolve. I’ve produced feasibility studies that highlighted cost drivers, mitigated risks, and offered value-engineering options that preserved scope while trimming non-essential spend. I’d approach your project by aligning the latest drawings with a transparent cost framework, establishing traceable line items, and building a pull-through BOQ that matches your preferred platform. Deliverables include a detailed cost breakdown with assumptions and contingencies, a focused feasibility report, and a fully aligned BOQ, all sourced against current market rates. I’m ready to review your plans, set milestones, and keep design momentum without budget surprises. Best regards,
$50 AUD en 1 jour
1,9
1,9

Hello! Expert is HERE!!! After reviewing your project, I've found that Excel, Construction Management, Risk Management, Project Management, Financial Analysis and Market Research are my key skills. I have the expertise required for your project and am confident I can successfully complete it. With 10 years of strong experience, I will meet deadlines and deliver a flawless result. I would like to discuss your project in detail. Please feel free to contact me anytime. Thank you, Moh A.
$120 AUD en 3 jours
0,0
0,0

I am pleased to submit my proposal for your infrastructure project currently in the planning and design stage. With solid experience in cost estimation, budgeting and quantity surveying. I can support you in developing accurate, transparant and realistic financial prejections before construction begins. at this early stage, it is crucial to establish : 1. reliable cost estimates aligned with current market rates 2. A clear feasibility assessment identifying cost drivers and risks 3. Accurate material quantity take - offs for engineering integration. My Goal is to ensure your project moves forward without unexpected budget overruns and with full cost traceability
$200 AUD en 7 jours
0,0
0,0

As an experienced finance professional, I offer a unique perspective to this quantity surveying project. With my ACMA qualification and solid background in cost estimation and financial analysis, I am confident in providing you with accurate and detailed cost breakdowns, complemented by well-informed assumptions and contingencies. In addition, my proficiency in using platforms including Excel ensures that your team will be able to easily interpret and update the final documents for long-term planning. One of the key aspects I bring to the table is my expertise in market research. In line with your requirements for referencing current market rates while aligning with regional data, I have the skills and resources to deliver this successfully. This aids in creating a robust and traceable bill of quantities which is essential for cost-effective budgeting throughout your project. Lastly, my commitment to on-time delivery without compromising quality aligns perfectly with your goal to keep the design moving steadily without budget surprises. My previous international clients can vouch for my ability to consistently deliver high-quality work, paving way for successful financial management. So let's commit together to bring your infrastructure project from the drawing board to reality, with accurate numbers that you can count on!
$140 AUD en 7 jours
3,7
3,7

----------------------- ✅✅✅✅✅ Ready To Support You Fully ✅✅✅✅✅ ----------------------- I understand you need early-stage quantity surveying support to ground your infrastructure project in realistic, defensible numbers before construction begins. I will deliver a fully measured BOQ aligned with your latest drawings, a transparent cost estimate (with contingencies and clearly stated assumptions), and a feasibility report outlining key cost drivers, risks, and value-engineering opportunities. My approach: • Detailed quantity take-offs using Excel/CostX methodology • Market-rate benchmarking (labour, plant, materials) with cited regional sources • Risk-adjusted budgeting with sensitivity considerations • Clear measurement traceability for every line item All outputs will be structured so your engineers and finance team can easily interrogate and update them. Ready to review the preliminary designs and define milestones to avoid downstream budget shocks.
$140 AUD en 7 jours
0,0
0,0

South melbourne, Australia
Méthode de paiement vérifiée
Membre depuis août 12, 2025
$30-250 AUD
$250-750 AUD
$8-15 AUD / heure
$250-750 AUD
$30-250 AUD
₹750-1250 INR / heure
$250-750 USD
₹12500-37500 INR
₹100-400 INR / heure
₹1500-12500 INR
$30-250 USD
minimum $50 USD / heure
₹750-1250 INR / heure
₹1500-12500 INR
€8-30 EUR
$30-250 USD
$250-750 USD
$2-8 AUD / heure
$250-750 AUD
$30-250 USD
£5000-10000 GBP
minimum £36 GBP / heure
₹100-400 INR / heure
$1500-3000 USD
£10-15 GBP / heure