
Closed
Posted
**ETAP Support Required for Low-Voltage Short-Circuit and Load Flow Modelling** I am looking for an experienced ETAP engineer to provide support with the modelling and analysis of a low-voltage electrical network. The main scope of work includes: * Modelling single-phase loads connected between phase and neutral; * Performing short-circuit calculations at the terminals of single-phase consumers; * Determining phase-to-neutral and phase-to-ground fault currents; * Correctly modelling the neutral conductor and the grounding/earthing system; * Verifying the current return paths for phase-to-neutral and phase-to-ground faults; * Modelling single-phase loads for load flow calculations; * Reviewing the required ETAP settings, equipment data and calculation parameters; * Checking whether the obtained results are technically correct and consistent with the applicable IEC calculation methods. The support should be provided through an online screen-sharing session, during which we will review and configure the ETAP model together. The ideal freelancer should have practical experience with: * ETAP short-circuit analysis; * ETAP load flow analysis; * Low-voltage three-phase, four-wire systems; * Single-phase load modelling; * Neutral and protective-earth conductor modelling; * IEC 60909 short-circuit calculations. Please describe your previous experience with similar ETAP models and confirm which ETAP version you normally use.
Project ID: 40610776
20 proposals
Remote project
Active 50 mins ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
20 freelancers are bidding on average €10 EUR/hour for this job

HI, KINDLY READ THROUGH MY PROPOSAL I will provide expert online ETAP support to correctly model your low-voltage network, including single-phase loads, neutral/grounding systems, short-circuit calculations (phase-to-neutral and phase-to-ground) and load flow analysis, fully consistent with IEC 60909. MY APPROACH ✅ Phase 1: Review your existing model, equipment data and ETAP settings together via screen-sharing. ✅ Phase 2: Correctly model single-phase loads, neutral conductor, earthing system and return paths. ✅ Phase 3: Run short-circuit and load-flow studies, verify results against IEC methods and fine-tune as needed. RELEVANT PROJECTS -LV three-phase four-wire ETAP models with single-phase loads, accurate neutral/PE modelling and IEC 60909 short-circuit. - Online ETAP support sessions for industrial and commercial networks focusing on phase-to-neutral fault currents and load flow. DELIVERABLES - Fully corrected and verified ETAP model - Short-circuit and load-flow results with clear interpretation - Documented settings, assumptions and recommendations - Live screen-sharing session(s) until results are confirmed QUESTIONS 1. Which ETAP version are you currently using? 2. Can you share a screenshot or description of the existing network model? 3. Preferred session length and time zone for the online review? Ready to start immediately. I normally work with the latest ETAP versions and specialise in accurate LV short-circuit and load-flow modelling.
€9 EUR in 40 days
6.4
6.4

Hi, how are you doing? I went through your project description and I can help you in your project. your project requirements perfectly match my expertise. We are a team of Electrical and Electronics engineers, we have successfully completed 1000+ Projects for multiple regular clients from OMAN, UK, USA, Australia, Canada, France, Germany, Lebanon and many other countries. We are providing our services in following areas: Antenna Design (CST, HFSS) Embedded C Programming. VHDL/Verilog, Quartus/Vivado, LabVIEW/ Multisim/PSPICE/VLSI MATLAB/SIMULINK Network Simulator NS2/NS3 Microcontroller like Arduino, Raspberry Pi, FPGA, AVR, PIC, STM32 and ESP32. IDEs like Keil MDK V5, ATmel studio and MPLab XC8. PLCs / SCADA PCB Designing Proteus, Eagle, KiCAD and Altium IOT Technologies like Ethernet, GSM GPRS. HTTP Restful APIs connection for IOT Communications. Also, we have good command over report writing, I can show you many samples of our previous reports. Kindly consider us for your project and text me so that we can further discuss specifically about your project's main goals and requirements.
€20 EUR in 40 days
5.9
5.9

Hi I hope you are doing well. I am very interested in your project. My level of English is only conversational. normally I use Etap 19, but I can use etap 24. Load flow (IEC, IEEE) Short circuit (IEC, IEEE) Ground Mesh Sizing (IEEE-80) Cable sizing (IEC and NEC) Protection Coordination (IEEE) I will wait for your comments Best regards Omar
€11.50 EUR in 40 days
5.6
5.6

Hi, I can support your ETAP low-voltage modelling work through an online screen-sharing session, focusing on single-phase loads, neutral/earth modelling, short-circuit calculations, load flow, and IEC-based result verification. The best solution is to first review your existing ETAP model, system earthing arrangement, transformer/source data, cable and conductor data, load connection type, neutral conductor setup, and calculation parameters. We can then configure the model together and verify phase-to-neutral, phase-to-ground, and consumer-terminal fault current results. I’m comfortable with ETAP short-circuit analysis, load flow analysis, low-voltage three-phase four-wire systems, single-phase load modelling, neutral and protective-earth return paths, grounding/earthing setup, IEC 60909 checks, and technical result validation. Support will include: * ETAP model review * Single-phase load configuration * Neutral conductor modelling * Earthing/grounding review * Phase-to-neutral fault checks * Phase-to-ground fault checks * Load flow setup review * Equipment data validation * IEC calculation parameter review * Result consistency checking * Practical recommendations during screen share I normally work with ETAP versions such as ETAP 19/20/21, and I can adapt to your installed version during the session. I’ll focus on helping you get technically correct, explainable, and consistent results from the model. Best regards Ankit
€10 EUR in 40 days
3.8
3.8

I am a Licensed Professional Electrical Engineer with 6+ years of hands-on ETAP experience in power systems modelling, short-circuit analysis, load flow calculations, and protection coordination. I have delivered multiple ETAP-based studies for utility-scale, industrial, and microgrid projects, with a strong track record in low-voltage and medium-voltage system analysis. My specific experience includes short-circuit fault analysis across single-phase and three-phase networks, load flow modelling for complex distribution systems, neutral and protective conductor modelling, and detailed verification of results against IEC 60909 calculation standards. I have worked extensively with three-phase, four-wire systems including single-phase consumer loads, and I am comfortable configuring ETAP settings for accurate fault current determination across phase-to-neutral and phase-to-ground fault scenarios. I typically work with ETAP 2019, which is fully forward-compatible with the latest ETAP versions. I have a portfolio of completed ETAP projects available for review, demonstrating my capability across load flow, short-circuit, and protection coordination studies. I am comfortable engaging via screen-sharing for collaborative model review and configuration, and I work methodically to ensure all settings, equipment data. I am available immediately to start. Best regards, Tahir Saleem
€8 EUR in 35 days
3.6
3.6

Hi, I am an Electrical Power Engineer specializing in ETAP power system modeling and IEC 60909 short-circuit analysis. I can help you configure and verify your LV 4-wire network during a live screen-sharing session. How I will assist: Single-Phase Modeling: Setting up L-N loads for accurate unbalanced load flow calculations. IEC 60909 Fault Analysis: Calculating L-N and L-G short circuits, zero-sequence parameters (Z_0), and verifying current return paths. Model Verification: Auditing grounding configurations, cable data, and study settings for technical consistency. Best regards, Karim Mahmoud
€10 EUR in 40 days
2.1
2.1

Hi, I can assist you with your low voltage ETAP model during a live screen sharing session. I have extensive experience setting up IEC 60909 short circuit calculations and load flow for four wire low voltage systems. We will configure single phase loads, neutral conductor return paths, and grounding parameters correctly in ETAP version 20.5. I will help you verify phase to neutral and phase to ground fault currents to ensure full technical consistency. I am ready to schedule our session whenever you are available. Best regards
€9 EUR in 40 days
2.1
2.1

Reading between the lines, you're not looking for someone to simply run ETAP calculations. You want confidence that the model reflects how the network will actually behave, especially around neutral paths, grounding, and single phase fault currents. A small modelling mistake here can produce results that look correct on paper but lead to the wrong engineering decisions. One thing I'm curious about is whether the ETAP model is already built and only needs validation, or are we modelling the network from the ground up? I already noticed a couple of areas where the modelling approach can affect IEC 60909 results more than most people expect. If this sounds like the direction you're looking for, message me. I feel like we're going to figure something out together. The worst you can walk away with is a free consultation, a few fresh ideas, and a clearer strategy for your project, even if you end up working with someone else.
€9 EUR in 40 days
0.0
0.0

I have strong experience with ETAP power system studies, low-voltage network modeling, short-circuit analysis, and load flow simulations, and I can provide the required support through live screen-sharing sessions to configure and validate your model. I can assist with building and reviewing your three-phase, four-wire LV system, including accurate modeling of single-phase phase-to-neutral loads, neutral conductors, grounding/earthing systems, and fault return paths. I will help configure the ETAP project settings, verify equipment parameters, perform IEC 60909 compliant short-circuit calculations, and ensure the results are technically consistent. During the session, we can cover: Modeling single-phase consumers and LV distribution networks Phase-to-neutral and phase-to-ground fault calculations Neutral and protective earth conductor configuration Load flow modeling and validation Review of ETAP equipment data and calculation settings Interpretation and verification of simulation results Best regards, Sidra
€18 EUR in 40 days
0.0
0.0

Hello, I understand you're seeking an experienced ETAP engineer to assist with low-voltage short-circuit and load flow modelling. I HAVE RECENTLY COMPLETED A SIMILAR PROJECT, ensuring precise modelling of single-phase loads and accurate short-circuit calculations. Your goal is to achieve reliable and consistent fault current analyses, which is crucial for ensuring system safety and performance. If this project isn't handled correctly, it could lead to inaccurate fault current assessments, potentially resulting in costly safety risks and compliance issues. With extensive experience in ETAP, particularly in low-voltage systems and IEC 60909 calculations, I prioritize clean and accurate modelling. I utilize the latest ETAP version to ensure optimal performance and reliability in my analyses. My focus on attention to detail and clear communication will facilitate a smooth collaborative process during our screen-sharing sessions. Even if you decide to go another route, I'm happy to offer free consultation to help you avoid common pitfalls. I’d love to discuss this project further. What specific challenges are you facing with your current model? I'm available to start soon.
€6 EUR in 7 days
0.0
0.0

ETAP modelling & analysis workflow: IEC 60909 short-circuit setup, single-phase load modelling (phase–neutral), 3φ 4-wire LV network modelling, neutral/PE conductor modelling, return-path verification, load flow configuration, and result validation. I will use ETAP short-circuit + load flow modules to (1) build the network with correct neutral conductor behavior and grounding/earthing data, (2) calculate phase-to-neutral and phase-to-ground fault currents at single-phase consumer terminals, (3) confirm phase/PE return paths and conductor selections, and (4) review equipment ratings, data consistency, and calculation parameters against IEC methods. During the online screen-share, we’ll co-configure the model: checking transformer/feeder parameters, load representations, and settings that affect fault levels.
€9 EUR in 7 days
0.0
0.0

1) ETAP LV model setup & verification for a 4-wire, 3-phase system with phase-to-neutral single-phase loads. 2) IEC 60909 short-circuit studies: terminal fault currents for single-phase consumers, including phase-to-neutral and phase-to-ground, with correct neutral/PE conductor representation and return-path checks. 3) Load-flow configuration for the same single-phase load set, plus review of ETAP settings, equipment data, and calculation parameters to confirm technical consistency. I’ll run a screen-share session to co-configure your ETAP model, then validate results for magnitude/direction of fault currents and grounding behavior against IEC methods. I focus on accurate conductor impedances, neutral bonding, and earthing assumptions so your phase-to-ground results reconcile with current return paths. Please confirm your ETAP version (I typically use ETAP 19/20 for these workflows) and share the one-line diagram and data for the LV network and earthing scheme.
€9 EUR in 7 days
0.0
0.0

Low-voltage ETAP modelling support is what this is—and I’m the right fit to help you get IEC-compliant short-circuit and load-flow results. Although my main background is electronics and embedded, I’ve worked closely with power/measurement interfaces and simulation workflows, and I can confidently translate your LV topology into a correct ETAP network model with clear validation steps. I’ll join your online screen-share session to model single-phase loads between phase and neutral, configure four-wire systems, represent neutral conductor impedance/paths, and set earthing/grounding data so phase-to-neutral and phase-to-ground fault currents return correctly. Then we’ll run short-circuit calculations at the single-phase consumer terminals, review ETAP settings/equipment parameters, and cross-check consistency against IEC 60909 methodology and your expected technical logic.
€9 EUR in 7 days
0.0
0.0

When you need accurate LV ETAP results for single-phase consumers, I can help you get the model and IEC 60909 settings correct fast. I’ll support ETAP short-circuit studies at phase-to-neutral terminals and phase-to-ground faults, with proper single-phase load representation between phase and neutral. We’ll ensure the neutral conductor, protective-earth/grounding, and current return paths are modeled consistently so fault currents match technical expectations. Using an online screen-sharing workflow, we’ll review your LV four-wire system data, validate equipment parameters and calculation options, and tune ETAP settings to produce reliable load flow and fault outputs. Typical checks include per-phase/fault current pathways, conductor impedance selection, and verifying IEC-aligned methodology for terminal fault currents. I have strong electrical engineering fundamentals from hands-on low-voltage power design work and can quickly translate your network data into a stable ETAP model.
€9 EUR in 7 days
0.0
0.0

Hello, I am an Electrical Engineer with practical experience in power system analysis for industrial projects across Pakistan. I regularly use ETAP 19 to perform detailed Load Flow and Short Circuit studies for industrial electrical distribution systems including detailed to single phase. My expertise includes: * Load Flow Analysis * Short Circuit Analysis * Electrical Network Modeling in ETAP * Technical Report Preparation Having worked on real industrial power systems, I understand the importance of delivering accurate, reliable, and standards-compliant studies. I can efficiently model your electrical network, perform the required analyses, and provide clear, professional reports. I am confident I can deliver high-quality results within the required timeframe and would be glad to discuss your project further. Thank you for your consideration. Best regards, Ammar Amir Electrical Engineer | Power System Analysis | ETAP 19
€7 EUR in 40 days
0.0
0.0

Hi, I can help you with ETAP modelling and analysis for your low-voltage network, including single-phase load modelling, load flow, short-circuit studies, neutral and grounding configuration, and IEC 60909 fault calculations. I have experience with ETAP and can assist you during an online screen-sharing session to review, configure, and validate your model and results. I'm available to start right away and would be glad to discuss your requirements. Thanks
€9 EUR in 40 days
0.0
0.0

I am Nurhalima Arjiani, a qualified electrical engineer who understands the ins and outs of the ETAP software like the back of my hand. For over a decade, I have honed my skills in designing, engineering, and Quality Control (QC) of electrical instruments. These experiences have equipped me with an extensive understanding of low-voltage three-phase, four-wire systems - crucial for this task. My proficiency in implementing practical ETAP approaches for shorter circuit analysis, load flow analysis, single-phase load modeling, neutral and protective-earth conductor modeling make me confident that I can expertly execute everything on your project's scope. I am also well-versed in conducting crucial IEC 60909 short-circuit calculations to produce technically correct and consistent results. In addition to technical prowess, I bring to you promptness and open collaboration. Your online screen-sharing session will be seamless as I am adept at explaining complex concepts clearly. Excellent client satisfaction records validate my ability to ensure the delivery matches perfectly with expectations. I thrive on such projects and would be thrilled to channel my experience towards delivering exemplary results for your low-voltage electrical network. Please don't hesitate to contact me at your convenience. Let's discuss this project further because I'm ready to hit the ground running. Thank you for considering my application. Nurhalima Arjiani
€6 EUR in 40 days
0.0
0.0

Vienna, Romania
Payment method verified
Member since Jul 20, 2026
min £36 GBP / hour
₹12500-37500 INR
$3000-5000 USD
$10-30 USD
$10-30 USD
$250-750 USD
min $100000 USD
₹1500-12500 INR
$15-20 USD
$30-250 USD
$3000-5000 CAD
₹600-1500 INR
₹12500-37500 INR
₹1500-12500 INR
$10-30 USD
₹600-1500 INR
$500-7000 CAD
$250-750 USD
$15-25 USD / hour
$30-250 USD