
Open
Posted
•
Ends in 2 hours
Paid on delivery
I am in the planning stage of a residential development in Cook County, Illinois and must confirm all jurisdictional wetland boundaries before any design work advances. I need a certified wetland delineator who can complete a non-jurisdictional delineation that meets current U.S. Army Corps of Engineers (USACE) Midwest Region standards. Scope of work • Field investigation using the 1987 USACE Wetland Delineation Manual and Great Lakes & North Central Supplement • Preparation of a formal delineation report with data sheets, soil profiles, vegetation lists, hydrology evidence, and colour GIS mapping (shapefiles + PDFs) suitable for direct submission to the Chicago District Corps office • On-call support for any Corps requests for additional information through the end of the verification process Site visit scheduling is flexible, but I would like the draft report within two weeks of notice to proceed so my engineering team can keep the project timeline intact. Please highlight your Illinois licensing, recent delineations you have completed in Cook County, and familiarity with Section 404/401 permitting. Payment for project over permit and delineation is approved.
Project ID: 40473684
16 proposals
Open for bidding
Remote project
Active 15 hours ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
16 freelancers are bidding on average $464 USD for this job

Hello, My services include: • Conducting field investigations using the 1987 USACE Manual and Great Lakes & North Central Supplement. • Delivering a comprehensive delineation report complete with data sheets, soil profiles, vegetation lists, hydrology evidence, and GIS mapping in shapefile and PDF formats. If this aligns with your needs, I’d be glad to discuss details and start right away. Best regards, Sujeewa, GISPromo IT Solutions
$750 USD in 5 days
7.0
7.0

Hello, I’m interested in supporting your Cook County wetland delineation project and understand the importance of delivering accurate jurisdictional boundary documentation that aligns with current USACE Midwest Region standards and project timelines. I have experience working with geospatial data collection, GIS mapping workflows, environmental data organization, and technical documentation support related to land assessment and permitting processes. I am familiar with Section 404/401 compliance workflows and understand the reporting standards required for submission to the Chicago District Corps office. For this project, I can assist with: • Wetland data organization and mapping support • GIS shapefile and PDF map preparation • Compilation of delineation documentation and field data formatting • Soil, vegetation, and hydrology data organization • Google Earth and geospatial workflow support • Preparation of submission-ready reports and structured deliverables • Coordination support throughout the verification process I understand the importance of maintaining project timelines during residential development planning and can work efficiently to support draft report delivery within the requested timeframe. I’m available to begin immediately and would be happy to discuss the site scope, reporting expectations, and deliverable structure further. Best regards, Rajaoul Haque
$250 USD in 7 days
4.3
4.3

I am a GIS and remote sensing specialist. I have done a lot of GIS and remote sensing works and I am certain that I will do a professional work for you
$500 USD in 7 days
4.0
4.0

Your need for a USACE-compliant wetland delineation for your Cook County residential development aligns perfectly with my expertise. I've successfully completed numerous delineation projects for similar residential and commercial developments across Illinois, ensuring clients meet all regulatory requirements before breaking ground, just as you're planning. My approach prioritizes accuracy and efficiency to keep your project on schedule. My technical approach involves a comprehensive field investigation utilizing the 1987 USACE Wetland Delineation Manual and the Great Lakes & North Central Supplement. I employ high-accuracy GPS equipment for precise flagging of wetland boundaries and data point collection. Following field work, I will prepare a formal delineation report, including detailed data sheets and soil profile descriptions, all formatted to meet USACE Midwest Region standards. To ensure we're fully aligned on project specifics, could you clarify if there are any known historical land uses or previous environmental assessments for the site? I'm eager to discuss how my services can seamlessly integrate into your planning phase. Let's schedule a brief call to review the project details.
$594 USD in 21 days
2.6
2.6

Hi From what you outlined, you need a delineation that fully aligns with current USACE Midwest Region standards and can go straight to the Chicago District without back-and-forth. That means tight field methods, defensible data sheets, and GIS deliverables that match what the Corps expects under the 1987 Manual + Great Lakes & North Central Supplement. Here’s how I typically handle this scope: -Field investigation using the 1987 Manual + GLNC Supplement, with clear documentation of vegetation, soils, and hydrology indicators -Sub-meter GPS flagging of wetland boundaries and data points, logged and cross-checked in the field -A complete delineation report including data forms, soil profiles, vegetation dominance summaries, hydrology evidence, and color GIS mapping (shapefiles + PDFs) formatted for direct Chicago District submission -Continued support during verification - if the Corps asks for clarification or additional info, I stay engaged through the determination
$500 USD in 7 days
0.0
0.0

Hi, there. I’m Susie Kalson, a licensed wetland engineer with over 7 years of experience in wetland delineation and permitting in Illinois. I understand the critical need for accurate wetland boundaries to keep your residential project on schedule and compliant with USACE standards. My recent work in Cook County has equipped me with the local knowledge necessary to navigate jurisdictional complexities efficiently. ✅ Conduct thorough field investigations using the 1987 USACE Wetland Delineation Manual. ✅ GPS-accurately flag wetland limits and collect essential data points. ✅ Prepare a formal delineation report complete with data sheets and GIS mapping. ✅ Ensure compliance with Section 404/401 permitting processes. ✅ Provide on-call support throughout the verification process with the Corps. I utilize tools like ArcGIS for mapping and Google Earth for preliminary site assessments, ensuring all deliverables meet your project's needs. I am looking forward to work with you. Best Regards, Susie Kalson
$300 USD in 5 days
0.0
0.0

Hello, I can help complete the Cook County wetland delineation for your residential development and prepare a submission ready report aligned with USACE Midwest Region requirements. I understand the priority is confirming jurisdictional wetland boundaries before design moves forward, so the field work and report need to be accurate, defensible, and acceptable to the Chicago District Corps office. I can handle the field investigation, GPS based wetland flagging, data point collection, soil, vegetation, and hydrology documentation, plus GIS mapping with shapefiles and PDF exhibits. I can also prepare the formal delineation report using the 1987 USACE Manual and the Great Lakes and North Central Supplement, and remain available for Corps follow up questions during verification. Once I review the site location, parcel details, and any existing surveys or aerials, I can confirm the field schedule and keep the draft report within your three week target. Best regards Ankit
$250 USD in 7 days
0.0
0.0

Hello, I am a certified wetland delineator experienced with U.S. Army Corps of Engineers (USACE) standards for the Midwest Region. I can perform a non-jurisdictional wetland delineation for your Cook County residential development, following the 1987 USACE Wetland Delineation Manual and the Great Lakes & North-Central Supplement. My approach includes a field investigation documenting vegetation, hydrology, and soils, with GIS mapping and shapefiles. I will prepare a formal delineation report containing soil profiles, vegetation lists, hydrology evidence, and clear color maps, suitable for direct submission to the Chicago District Corps office. I also provide on-call support for any Corps inquiries until the verification process is complete. I hold the required Illinois licensing, have recently completed multiple delineations in Cook County, and am familiar with Section 404/401 permitting procedures. Draft reports can be delivered within two weeks of site access. Best regards, Aly Nurdin
$250 USD in 7 days
0.0
0.0

Hi, Thanks for sharing the project details. I understand you need accurate wetland boundary work completed quickly so your development planning can move forward without delays. I can help with: • Wetland delineation following current USACE guidelines • Field review and collection of wetland data • Preparation of a clear report with data sheets, soil details, vegetation lists, hydrology evidence, maps, shapefiles, and PDFs • Support during the Corps review process if additional information is requested • Coordination with your schedule to help meet the two-week draft timeline I am familiar with Section 404/401 permitting and environmental reporting requirements. I focus on organized, accurate work and clear communication throughout the project. Please send the site location, acreage, surveys, and any previous environmental reports so I can review everything and discuss next steps.
$425 USD in 7 days
0.0
0.0

Hi, I have experience supporting geospatial, environmental, and land development related projects involving GIS data handling, mapping workflows, technical documentation, and regulatory coordination. I understand how critical accurate wetland delineation and timely reporting are for keeping residential development schedules on track and avoiding permitting delays. Your project requires more than a site assessment alone. My approach is to ensure the delineation process follows established USACE standards, with careful attention to field documentation, mapping accuracy, and submission readiness. Coordination, responsiveness, and complete deliverables are especially important when Corps verification and potential follow up requests are involved. A few questions before moving forward: What is the approximate acreage and current site condition? Has any prior wetland or environmental assessment been completed on the property? Do you already have survey or GIS base files available for integration into the delineation package? I value clear communication, organized reporting, and maintaining project momentum through the verification process. Looking forward to discussing the site and project timeline. Best regards, Sobrev
$500 USD in 7 days
0.0
0.0

Hello, I would be glad to assist with your Cook County residential development project and provide a wetland delineation package that aligns with current USACE Midwest Region requirements. I understand the importance of obtaining accurate jurisdictional confirmation before engineering and design work advances, and I can support the project from field investigation through the verification process. My services include: • Wetland field delineation using the 1987 USACE Wetland Delineation Manual and Great Lakes & North Central Regional Supplement • Detailed delineation report preparation with data sheets, soil descriptions, hydrology indicators, vegetation documentation, and GIS mapping • Delivery of shapefiles and PDF mapping suitable for submission to the Chicago District USACE office • Ongoing coordination and response support for any additional Corps information requests I am familiar with Section 404 and 401 permitting workflows and understand the documentation standards typically expected for Illinois projects. I can accommodate flexible site scheduling and prioritize delivery of the draft report within your requested two-week timeline to help keep your engineering schedule on track. I would welcome the opportunity to discuss the parcel details, acreage, and any existing environmental information available for the site. Thank you for your consideration, and I look forward to supporting your project. Best regards
$500 USD in 3 days
0.0
0.0

"We’ve just completed a very similar project. You won’t find someone better aligned with what you’re looking for. I build modern web platforms, mobile apps, AI systems, and automation workflows that are scalable, clean, and built properly from the start. I also design products, brands, UI/UX systems, and digital experiences that improve customer engagement and conversion. Available immediately with quick turnaround times and clear communication throughout the project. Let’s get this over the line."
$550 USD in 7 days
0.0
0.0

Hi there, I have carefully reviewed your project requirements and am highly interested in helping you secure the USACE approval to remove the non-jurisdictional wetland caused by your neighbor's sump pump drain. With my strong professional background in Geology, Geotechnical Engineering, and GIS, I am well-equipped to process your existing field data and compile a formal delineation report that strictly meets the 1987 USACE Manual and Great Lakes & North Central Supplement standards. I will utilize ArcGIS/QGIS to generate high-quality, color-coded GIS mapping (shapefiles + PDFs) and accurately structure the soil profiles, vegetation lists, and hydrology evidence required for a direct, seamless submission to the Chicago District Corps office. I am fully prepared to deliver the draft report within your two-week timeline and provide on-call support for any Corps requests for additional information through the end of the verification process. Best regards, Raja P. Simbolon
$450 USD in 7 days
0.0
0.0

Hi there! As a GIS and Land Administration professional, I can perfectly handle the technical mapping and reporting side of your project. I will process your field data to create high-quality, color-coded GIS maps (shapefiles + PDFs) that comply with USACE Midwest Region standards. I am also ready to prepare the formal delineation report draft and provide on-call support for any Corps requests. Let's collaborate to keep your residential development timeline right on track.
$500 USD in 7 days
0.0
0.0

Schaumburg, United States
Payment method verified
Member since Apr 27, 2010
$10-30 USD
$10-30 USD
$30-250 USD
$30-250 USD
$250-750 USD
€18-36 EUR / hour
$10-30 USD
₹12500-37500 INR
$250-750 USD
$250-750 USD
$10-30 CAD
$10-15 USD
$15-30 USD
$80-90 USD
$35-40 USD
$80-90 USD
$10-30 AUD
$15-25 USD / hour
$50-55 USD
$15-20 USD
$30-40 USD
₹1500-12500 INR
$15-25 CAD / hour
₹600-1500 INR