
Closed
Posted
Paid on delivery
I have a fully drafted Bill of Quantities and need a sharp set of eyes to double-check the material rates. The scope is strictly a rate review—quantities are already verified—so the task is to compare each listed rate against the supplier quotes I will share and flag anything that looks off. You will work in the original Excel BOQ, adding comments or highlighting where adjustments are required and noting the correct rate based on the supporting quote. Construction industry familiarity and solid Excel skills are essential; speed and accuracy matter more than fancy formatting. Deliverables: • The BOQ file returned with every reviewed line clearly marked—either confirmed or corrected. • A concise summary sheet outlining all changes and the rationale behind each adjustment. Once I receive the updated file and summary, I’ll spot-check a sample of the lines; if everything aligns with the quotes, the job is done.
Project ID: 40425282
15 proposals
Remote project
Active 7 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
15 freelancers are bidding on average $24 USD for this job

Hello! I can help with reviewing your BOQ material rates by carefully comparing each rate in the Excel file against your supplier quotes. I will mark all confirmed or corrected rates clearly and provide a concise summary sheet explaining every adjustment. My focus will be on accuracy and speed to ensure your review is thorough without unnecessary formatting. Could you please share the supplier quotes format and any preferred way you'd like the comments or corrections noted within the Excel BOQ? Looking forward to your response! Thanks,
$30 USD in 1 day
5.3
5.3

Hi, With over 7 years of experience, I am highly skilled in data entry and processing, with a solid understanding of the construction industry. My background in the field allows me to appreciate the value of accurate BOQs, ensuring that projects stay within budget and avoid any unnecessary costs. Thank you
$20 USD in 1 day
4.2
4.2

Hello, I am engineer familiar with this task. I can start the work immediately once u awarding me. kindly chat with me we can discuss details and better understanding of your vision. I will provide u 100% correct work. thanks
$20 USD in 7 days
3.7
3.7

I can thoroughly review your BOQ rates by cross-checking each line item against the supplier quotations you provide. Since the quantities are already verified, my focus will be strictly on ensuring the accuracy and consistency of unit rates. I will work directly in your original Excel BOQ file, clearly marking each item as either confirmed or requiring correction. Any discrepancies will be highlighted with comments and adjusted based on supporting quotation evidence to maintain full traceability. In addition, I will prepare a separate summary sheet listing all changes, including original vs corrected rates and a brief justification for each adjustment. This will make it easy for you to review and audit the revisions. I am an engineer with relevant experience in BOQ preparation and rate analysis, so I am familiar with construction costing structures, supplier quote evaluation, and practical market rate validation. Accuracy and attention to detail will be maintained throughout the review process.
$25.99 USD in 1 day
3.9
3.9

Hello! I can thoroughly review your BOQ material rates against the supplier quotes and flag any discrepancies with clear justification. I have strong construction industry knowledge and hands-on Excel experience, ensuring fast and accurate rate validation. I will work directly in your original BOQ file, marking each line as confirmed or corrected with precise comments. Alongside this, I’ll deliver a clean summary sheet explaining every change and its supporting quote reference.
$15 USD in 2 days
3.9
3.9

Hi there, I am a Data Reconcliation specialist and Data Analyst as well since last 13 years with portfolio of 5000+ projects. I can do this data review for you and can finalize it within 24 hours. Please ping if interested.
$50 USD in 1 day
3.1
3.1

Hi There, I can review your BOQ material rates against supplier quotes and clearly mark each line as confirmed or corrected in the original Excel file. I have strong Excel skills and experience working with construction-related cost/rate reviews, ensuring accuracy and clear documentation. I’ll also prepare a concise summary sheet showing all rate changes with the reason and quote reference. Let’s share the BOQ and supplier quotes so I can start the review. Thanks & Regards Hafiz Muhammad Iqbal
$10 USD in 7 days
3.1
3.1

Hi, I’ll review your BOQ rates line-by-line against the supplier quotes and clearly flag any discrepancies or corrections. What you’ll get: * Reviewed Excel BOQ with each rate marked as confirmed or corrected * Highlighted adjustments with comments for easy review * Corrected rates tied directly to supplier quote references * Summary sheet listing all changes and rationale * Clean, accurate review without altering verified quantities I understand construction BOQs and will focus on precision and fast turnaround. I’ve completed similar Excel and BOQ review projects with 5⭐ feedback for accuracy and delivery. Timeline: same day or within 24 hours Budget: $20 total Please send me a message so we can get started immediately!
$20 USD in 1 day
2.4
2.4

Ross here from Arasaka Systems. Hope this message finds you well. I can help with a thorough and accurate review of your Bill of Quantities material rates. I've successfully assisted on similar projects where precision and quick turnaround were crucial, ensuring alignment with supplier quotes for clear, professional results. I understand you need a clean, integrated, high-performing review that flags discrepancies directly in the original Excel BOQ and provides a concise summary of changes made. Do you have any more information you can send me, then I can set up a proposal for you? I offer detailed Excel analysis, construction industry insight, and meticulous rate comparisons to ensure accuracy and clarity. It would be a pleasure to be of assistance. Regards, Ross, Arasaka Systems
$28 USD in 2 days
2.0
2.0

Hi! I can help review the BOQ rates and compare them against the supplier quotations carefully and accurately. I am comfortable working with Excel spreadsheets, validating data, and highlighting discrepancies with clear comments and summaries. I pay close attention to detail and can provide an organized review with all confirmed and corrected rates clearly marked. Please feel free to share a sample of the BOQ and supplier quotes so I can better estimate the turnaround time.
$10 USD in 2 days
0.0
0.0

Hi, I am a piping engineer in the oil & gas sector with experience in P&ID, Isometric Drafting (2D-AutoCAD), and generating bills of materials. If you feel I’m a good fit, I’d be happy to chat and see how I can help with the project. Regards Sreehari Sudhakaran Mechanical Design Engineer
$30 USD in 4 days
0.0
0.0

Hi, I can review the BOQ material rates against the supplier quotes you provide and mark each line as confirmed or corrected inside the Excel file. I will keep the original BOQ structure, highlight adjustments clearly, and add a concise summary sheet explaining each changed rate and its source quote. I can work quickly and focus strictly on the rate review scope.
$25 USD in 1 day
0.0
0.0

Sanad, Bahrain
Payment method verified
Member since Feb 11, 2019
$10-30 USD
$10-30 USD
$30-250 USD
$30-250 USD
$10-30 USD
₹750-1250 INR / hour
$15-25 USD / hour
$30-100 USD
$30-250 USD
₹600-1500 INR
$250-750 USD
$30-50 USD
₹600-1500 INR
₹150000-250000 INR
$10-30 USD
₹400-750 INR / hour
₹400-750 INR / hour
$8-15 USD / hour
$30-91 USD
€2-6 EUR / hour
$10-30 USD
₹750-1250 INR / hour
₹75000-150000 INR
$50-51 USD
$30-250 USD