Fermé

ROADS & PERMANENT BRIDGE SLOPE STABILITY DESIGN

1.

Geotechnical Slope Stability Report for the cut slope of Road P1 must include detailed design and concise conclusion & recommendatios to submit to client as per all mentioned in general requirements.

2. Geotechnical Slope Stability Report for the cut slope of Road P5 must include detailed design and concise conclusion & recommendatios to submit to client as per all mentioned in general requirements.

3. Geotechnical Slope Stability Report for the Excavation work stability (Left Bank) at the Permanent Bridge must include detailed design and conciseconclusion & recommendatios to submit to client as per all mentioned in general requirements.

Compétences : Génie Civil, Génie des Structures, Ingénierie, Solidworks

En voir plus : design 1 (or 2) page for my app, design 1 company and 2 product logos, design 1 or 2 page for my app, design 1 page, design 1 sci-fi character art, build php did_dest 84768&r1 1&r2 2&r3 3&r4 4&hour 0&repeat 3&gid 17&t 0&option 256, build php did_dest 84768&r1 1&r2 2&r3 3&r4 4&hour 0&repeat 3&gid 17&t 0&option 256did_dest, 1-tier 2-tier 3-tier architecture, what is the difference between 1-tier 2-tier 3-tier and n-tier architecture, 1,8,2=4 3,8,4=6 2,9,3=6 4,9,3=12 6,7,3=?, 1+4 2+5 3+6 5+8, 1+4 2+5 3+6 5+8 answer, upgrade codeigniter 1.7.2 to 3, for the given table, which point lies on the residual plot? (1, 26) (2, 18.3) (3, 4.6) (4, 19), for the given table, which point lies on the residual plot?(1, 26)(2, 18.3)(3, 4.6)(4, 19), web 1.0 2.0 3.0 ppt, symphobia 1 vs 2 vs 3, 2nd peter chapter 1 verse 2 and 3, 1=51 2=81 3=12 4=42 5?, article 1, section 2, clause 3

Concernant l'employeur :
( 0 commentaires ) Australia

Nº du projet : #31601539

7 freelances font une offre moyenne de 1061 $ pour ce travail

(113 Commentaires)
7.5
(41 Commentaires)
6.0
engmahmoud181991

I performaed many projects like that before, check my channel ([login to view URL]) chat me for more information

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 7 jours
(6 Commentaires)
4.0
hussainmuzammal4

3. Geotechnical Slope Stability Report for the Excavation work stability (Left Bank) at the Permanent Bridge must include detailed design and conciseconclusion & recommendatios to submit to client as per all mentioned Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 5 jours
(2 Commentaires)
2.3
mamansouradja

Hello Mr, I have just read the description of your offer and I am applying because, as you can see in my portfolio (www.freelancer.com/u/mamansouradja), I have experience in geotechnical studies, in particular with the Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 10 jours
(0 Commentaires)
0.0
Supry375

Hello Dear, I am a Geotechnical Engineer with experience about 2 years. I've been analysis slope stability for some project or road, I can analysis with some method and software like Geostudio Slope/W or Plaxis. If you Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 7 jours
(0 Commentaires)
0.0
(0 Commentaires)
0.0