Fermé

Lot 96 Atascadero

11 freelances font une offre moyenne de 1114 $ pour ce travail

(89 Commentaires)
7.2
(35 Commentaires)
5.8
(10 Commentaires)
5.5
(10 Commentaires)
4.6
okasha1st

I'm a civil engineer and expert in civil3d, ,sewergems so i can use it for quantity takeoff for earthwork cut &fill ,grading road work and and utilities networks , land subdivision (land development),site design I c Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 7 jours
(4 Commentaires)
4.1
VisualStudio77

Hi there! We are a team of Engineer, with plenty of experience in Civil engineering , Structural engineering and architecture . We provide service in the 50 states in USA. We can take care of your full set drawings ne Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 7 jours
(2 Commentaires)
3.9
(2 Commentaires)
3.8
shri1494

Hi there, This is shrijen, highway design engineer from srilanka. I saw your project details, it’s pretty much similar field for me. I have been working these kind of works since 2019. And also I have professional cert Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 7 jours
(3 Commentaires)
2.4
Hellokate55

❤️❤️❤️ Nice to meet you ❤️❤️❤️ Thank you for posting project. I am interested in your project. I checked your description carefully. I am an architect and structural engineer. I'll provide all drawing sets and wonderf Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 3 jours
(0 Commentaires)
0.0
zghair83

Hi, I would like to submit my offer to provide civil engineering ( site plan , grading plan , drainage plan , grading volume calculations and driveway ). You need to provide topographic surveying on cad file. Please Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 14 jours
(0 Commentaires)
0.0
rahul7civil

HELLO I AM A CIVIL ENGINEER. AS PER YOUR REQUIREMENTS I AM READY TO HANDLE THE HIGHWAY PROJECT. I WILL PROVIDE YOU THE SITE/ LOCATION PLAN, DETAILED CROSS SECTION WITH GRADING, DETAILED ROADWAY PLAN, DRAINAGE PLAN, FRO Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% USD en 30 jours
(0 Commentaires)
0.0