Fermé

Calculate construction cost of a building

The task is to calculate the construction cost of 3-4 buildings. We would provide you the name, address and the area of the buildings whose replacement cost is to be calculated. Let us know if there are any other data requirements like layout plans or more. Civil engineers or architects are preferable.

For sample, please calculate the replacement cost of a building with below details and submit your answer with detailed calculations in a word file.

Address: Sector 65, Gurgaon, Haryana.

Total floors: 40

Total units: 160

Area of a unit: 142.7 sq.m.

Compétences : Génie Civil, Architecture du Bâtiment, Génie des Structures, Excel, Infrastructure Architecture

En voir plus : i need a phd research proposal writer who can write 3 4 research proposals on potential phd research topics in the following are, 1. What is occurring in packets 3-4? Is it evidence of an intrusion? Provide an interpretation of what is occurring, and the po, 2. Architecture diagram. 3. User Interface Wireframe or the frontend design. 4. data flow design / ER diagrams if any, i will complete task within time. i spent 3-4 hours daily for my project., There will be just a few styles (3-4 for now). We will be using the Spree Commerce framework which uses Bootstrap 3.0 and SCSS f, the lcd for the fractions 1/3, 3/4, 5/32, and 8/9 is, express the fractions 3/4 7/16 and 5/8 with the lcd brainly, rsmeans building construction cost data 2017 pdf, the total cost of crashing the project by 4 days is, in exercise 3.4 we saw two distributions for triathlon times, apartment building construction cost breakdown, the impact of changes on construction cost and schedule, 1 2 3 4 5 6 7 8 9 10 what's the mistake, find the mistake 1 2 3 4 5 answer, what is the product of 3 4 and 5, find the next number 3,4,6,8,12,14,18,20, fill the missing number or letter in the given series 1 3 4 8 15 27 __, which term of the progression 20 19 1/4 18 1/2 17 3/4..........is the first negative term, the next number in the series 3, 4, 6, 7, 9, 10 is:, a stem-and-leaf plot has the key 3|4 = 34. how would the value 8 be represented? 3|8 1|8 8|0 0|8

Concernant l'employeur :
( 8 commentaires ) Gurgaon, India

Nº du projet : #32256671

10 freelances font une offre moyenne de 6600 ₹ pour ce travail

(430 Commentaires)
8.3
(24 Commentaires)
5.9
(6 Commentaires)
4.0
SandeepKalkal

Hi there, Go through your requirement , you need cost consultant for your project. I am an architect and I have team for the cost calculation and I can provide the calculation sheet as per your or requirement. Kindly s Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% INR en 7 jours
(1 Évaluation)
2.6
Vishnu29thakur

Hlo sir my name is vishnu Thakur and I am interested your project and I have 3 year old experience that's why please accept my bid

%bids___i_sum_sub_32% %project_currencyDetails_sign_sub_33% INR en 1 jour
(0 Commentaires)
0.0
(0 Commentaires)
0.0
Surajvkumbhar

Hi, I am Graduate civil engineer with 6 year of experience in Estimation, Costing and Billing in all types of construction projects. Thanks and Regards, Suraj Kumbhar

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% INR en 7 jours
(0 Commentaires)
0.0
toriqlfc

Hi I am quite interested in getting this project. can you send a working drawing for me to review so that I can calculate the costs required and my time to work on it. please contact me so we can discuss more about thi Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% INR en 7 jours
(0 Commentaires)
0.0
bilalahmadd9

I am Bilal Ahmad from Kashmir, a civil engineer and cost estimation expert having more than three years of experience. I would like to get the opportunity to work with you. Please accept my proposal and we will negotia Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% INR en 7 jours
(0 Commentaires)
0.0
OBS7

I'm a civil engineer, bridges roads buildings option, i had a years of experience about calculating and studing bulding projects.

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% INR en 7 jours
(0 Commentaires)
0.0