Fermé

bar chart of all activites for construction of audotorium

6 freelance ont fait une offre moyenne de 4100 ₹ pour ce travail

hasance06

Please check your PM for details.

5000 ₹ INR en 7 jours
(23 Commentaires)
4.6
Ljorge

Please check PMB for details. Thanks

5000 ₹ INR en 5 jours
(0 Commentaires)
0.0
johnfabraham

would love to get his project!!!

4500 ₹ INR en 7 jours
(0 Commentaires)
0.0
arunbinay

I have worked for Pharma & Chemical Plants construction Project, it will take few calculations to get Heat load calculation & on the basis of that we can describe schedule

4100 ₹ INR en 3 jours
(0 Commentaires)
0.0
onlyfairdeals

HI, I am very much interested in your project , please check Pm for details. Thanks

3000 ₹ INR en 2 jours
(0 Commentaires)
0.0
qscivil

Cost and quantity survey and evaluation The control of construction costs is one of the most important components of building economics. Even though the construction cost control has to be a continuous process - the Plus

3000 ₹ INR en 3 jours
(0 Commentaires)
0.0