
Closed
Posted
Paid on delivery
I’m updating an existing bathroom so it’s genuinely safe and comfortable for an elderly family member. The first step is to eliminate any trip hazards: the door threshold (sill) must be removed flush with the hallway floor, and the current boxed-in shower cubicle needs to go. In its place I want a seamless walk-in shower area with proper drainage, waterproofing, and a hand-held shower on an adjustable rail. Safety upgrades I definitely need are sturdy grab bars positioned beside the toilet and inside the shower, plus non-slip flooring throughout the room (tiles or sheet vinyl are both fine as long as the slip-rating is high). Please allow for gentle floor grading into the new shower pan so no lip is required. You’ll handle demolition, plumbing relocation if the drain needs moving, waterproof membrane installation, tiling or flooring, and finishing carpentry around the doorway once the sill is gone. Include all fixtures and fittings installation, caulking, and final cleanup. Deliverables • Site-ready bathroom with door threshold removed and level transition • Fully waterproofed walk-in shower with correct fall and drain • Installed grab bars and non-slip floor surface • All plumbing, tile, and trim work tested and complete I’ll sign off once the space passes a quick water test, all fixtures feel solid, and the floor shows no uneven edges. Please outline your estimated timeline, any material recommendations, and recent examples of accessible bathroom work when you bid.
Project ID: 40576158
1 proposal
Active 4 hours ago
Location: Singapore
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
1 freelancer is bidding on average $750 SGD for this job

Hello. I can assist you with home remodeling design. I have extensive experience providing drawing packages for new construction and remodeling. I can provide all the remodeling drawings required for building permits. My greatest strength is delivering high-quality results within a short timeframe. If you have sufficient existing drawings, I can complete the project within 1 to 2 days. It is okay even if you do not have drawings. In this case, I will complete the project within 4 to 7 days. If you are looking for a remodeling drawing expert, please choose me. I guarantee satisfactory results. Thank you. Rey
$750 SGD in 2 days
0.0
0.0

Singapore, Singapore
Payment method verified
Member since Jul 11, 2026
$15-25 USD / hour
$250-750 USD
£100-175 GBP
$250-400 AUD
€180 EUR
$10-30 AUD
$750-1500 AUD
₹600-1500 INR
$250-750 USD
€111 EUR
$10-60 USD
$250-750 AUD
$30-250 USD
₹75000-150000 INR
£50-300 GBP
min $50 USD / hour
$30-250 USD
$190 AUD
₹37500-75000 INR
€180 EUR