Fermé

Integrated Process in Manufacturing Industries: (Garments Industries) -- 2

This paper will suggest that the combination of Affinity Diagram, Matrix Diagrahm, Kaizen management - Problem-solving method 5W1H, SOP (Standard Operation Procedure ), and PDCA method will be used to make an integrated process Framework (IPW) for manufacturing business performance.

Continuous improvement for any sustainable business is essential though various methods are used in different organizations worldwide. However, other models and approaches are scattered, which do not provide problem statements, problem-solving techniques, continuous improvement, standard operation procedure (SOP), and PDCA cycle to sustain their business.

Compétences : Rédaction Académique, Rédaction scientifique

Concernant le client :
( 0 commentaires ) Amsterdam, Netherlands

Nº du projet : #34006474

4 freelances font une offre moyenne de 20625 ₹ pour ce travail

maaria1991

Hi, I am a professional research writer with 5 years’ experience and master qualification. I will give awesome quality of work according to your project requirements. I have been already written many research writin Plus

%bids___i_sum_sub_32% %project_currencyDetails_sign_sub_33% INR en 1 jour
(147 Commentaires)
6.3
ProfessorxCorp

Hi, We have read your description and we can do it for you on time. Our versatile and dedicated team members have experienced in these types of projects. Price is negotiable and our main motive is to provide quality pr Plus

%bids___i_sum_sub_32% %project_currencyDetails_sign_sub_33% INR en 1 jour
(5 Commentaires)
2.8
ujjwalconcepts

Hello, very warm regards from Ujjwalconcepts. I have gone through your Project Requirements & fully understood the queries. I am having manufacturing Engineering Experience and i can help you out in this paper. Revert Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% INR en 4 jours
(0 Commentaires)
0.0
babunarsim1

Greetings. i am a LEAN and 6Sigma Black Belt, in the manufacturing and in the Design area for 3 decades. Successfully carried out Hands on work on more than 50 projects of different portfolio using the LEAN Principles Plus

%bids___i_sum_sub_35% %project_currencyDetails_sign_sub_36% INR en 7 jours
(0 Commentaires)
0.0