Fermé

Traffic engineering - Freeway analysis - calculations and technical report in 3 days

Ce projet a été décerné à imrance08 pour $55 USD.

Obtenez des devis gratuits pour des projets similaires
Budget du projet
$30 - $50 USD
Nombre total d'offres
4
Description du projet

This assignment has to do with Environmental/Civil engineering. It requires questions to be answered and a technical report to be completed which involves relevant calculations. The word count is estimated to be 1500 words (excluding references and calculations) - although all the relevant references (only from academic journals published in the last ten years) and relevant calculations must be included.

This needs to be completed in 3 days. If needed, relevant lecture notes and study materials can be provided as well. Upon completion of the assignment, if teacher's feedback is received, that will need to be addressed as well (additional time will be provided for it)

Décerné à:
Compétences requises

Vous cherchez à gagner de l'argent ?

  • Fixez votre budget et les délais
  • Décrivez votre offre
  • Faites-vous payer pour votre travail

Embauchez des Freelancers qui ont aussi fait une offre sur ce projet

    • Forbes
    • The New York Times
    • Time
    • Wall Street Journal
    • Times Online