Conception d'énergie renouvelable Jobs
To design a 300 litres per day, operating over 6 hours, Multi Stage Flash Unit ( MSF) evaporator condenser for fabrication for bio medical application.
I require a set of mechanical and plumbing plans for a building for an HVAC system, plus hot and cold water flow. The uploaded plans show the level of detail required. Plumbing fixture plan is NOT required. The requirements are: 1. Prepare a heating and cooling schedule/load calculations for each area/room of the property - you will need to tell me with what information you need and I will provide it by return. I have calculations done, but would like them to be confirmed and detailed. 2. Prepare a heating and cooling plan for the building - based on location - using radiant in floor and in-wall piping, supplemental radiators/other as required and a manifold plan, including optimum locations. 3. The heating/cooling plan should use air-to-water heat pumps, and auxiliary electric as needed ...