    Title: GRC + MS Structure Estimation Required (BOQ, MS Weight, Installation Costing) Project Description: I need an experienced estimator who has worked with GRC (Glass Reinforced Concrete) façade systems and MS structural support structures. The task is to prepare a complete cost estimate and BOQ for a GRC façade supported on MS framing. Scope of Work: Calculate GRC quantities (sqm) Calculate MS support structure weight (kg) Identify bracket, anchor and fixing quantities Estimate installation labour cost for GRC and MS Include scaffolding cost based on height Provide rate analysis (material + labour) Prepare final BOQ in Excel Provide a summary sheet suitable for client quotation Required Experience: GRC panels, jalis, cornices, moulded elements MS RHS/SHS/a...

    €106 Average bid
    €106 Offre moyenne
    6 offres

    I have a set of oil-pipeline isometric drawings in PDF that need to be fully weld-mapped and auto-spooled. From each sheet I must be able to pull a complete Material Take-Off, exact cut lengths, joint details, and a spool-wise BOQ that I can forward directly to procurement and fabrication. The workflow you propose is important to me, so please outline in your proposal how you intend to import the PDFs, generate intelligent weld numbers, split the line into logical spools, and export the data. Mention the software you will rely on—whether that is Spoolgen, Autospool along with any custom scripts or macros you plan to use. Deliverables • Clean weld-mapped isometric PDFs (showing weld numbers and spool number) • Native files from your chosen platform • Excel or CSV ...

    €440 Average bid
    €440 Offre moyenne
    8 offres

    I have a complete set of architectural drawings and I need an accurate material take-off prepared from them. The scope is limited strictly to what appears on those architectural sheets—no structural, plumbing or other disciplines—so your focus will be on reading plans, elevations, sections and details to capture every relevant item. Your task is to measure and tabulate the material quantities for: • Brickwork (including any parapets or feature walls) • Internal and external plaster • All tiles called for in the finishes schedule (floors, walls, skirtings) • False ceiling areas • Paint, broken down into internal and external surface areas Please provide the results in a clear spreadsheet (Excel or Google Sheets) showing take-off notes, unit o...

    €14 Average bid
    €14 Offre moyenne
    6 offres

    I have civil and interior works coming up in an industrial setting and I need a sharp set of eyes on both the numbers and the paperwork. Your main tasks are twofold: • Budget estimation – I will send you drawings, specs, and any existing take-offs. I need you to develop a complete cost breakdown: labour, materials, prelims, contingency and mark-ups, all clearly organised in Excel (or CostX if you prefer) so I can track every rupee. Highlight any value-engineering opportunities you spot along the way. • Tender preparation – Using the same data set, prepare the full tender package: BOQ, rate analysis, commercial terms, clarifications, and any schedules normally demanded by industrial clients. The end file should be submission-ready and formatted to match the employer...

    €18 Average bid
    €18 Offre moyenne
    4 offres
    Commercial Building BOQ & Estimate
    15 heures left
    Vérifié

    I have a full set of civil drawings for a mid-size commercial building and now need a complete, well-structured Bill of Quantities with an accompanying cost estimate. Every item that appears on the drawings must be broken down and priced, covering material, labour and equipment costs so that I can move directly into tendering with confidence. Please work from the drawings exactly as issued; no scope assumptions beyond what you see. Use industry-standard descriptions and measurement rules (SMM7 or local CESMM equivalent) and structure the spreadsheet so rates, quantities and totals can be traced quickly. An editable Excel workbook is preferred, but you may also supply a locked PDF summary for presentation purposes. Deliverables: • BOQ in Excel, fully itemised with separate columns fo...

    €78 Average bid
    €78 Offre moyenne
    12 offres

    I have a detailed infrastructure CAD drawing and need an experienced quantity surveyor to extract every relevant figure for the structural elements shown. Your task is to study the plan, identify each line item, and produce a clear breakdown in an Excel spreadsheet. The sheet should separate foundations, columns, beams, slabs, reinforcement, and any other structural components you find, with units, measured dimensions, and calculated totals laid out so another engineer can follow the logic without opening the CAD file. Please reference drawing layers or coordinates where helpful. Accuracy is critical; figures must reconcile with the drawing scales and any notes embedded in the file. I will review by spot-checking several items against the CAD, so your formulas and cell references nee...

    €12 Average bid
    €12 Offre moyenne
    11 offres