Info graphic required for Green Factory timline
- État: Closed
- Prix: $51
- Propositions reçues: 29
Résumé du concours
A nice info graphic to be created with these events:
VALENCIA THEATER SEATING Timeline of Sustainability
80% powered by Renewable Energy
JUNE 2005 - Valencia secured their first wind turbine within factory walls, possessing 15kW of generating power.
AUGUST 2008 - Conducted a 50kW solar power installation which amounted to renewable energy to account for 15% of the total electricity consumption.
MARCH 2010 - All wood now sourced from ethically sustainable forests.
JANUARY 2012 - Renewable energy reaches 50% of total energy consumption with the combination of 150kW wind and solar power.
MAY 2014 - Instillation of storage tanks that hold water and nitrogen designed to run on solar energy for sustainable use.
SEPTEMBER 2015 - 670kWh lithium ion battery storage system is installed to increase renewable power efficiency and also storage for energy during peak production.
SEPTEMBER 2018 - An additional 150kW of wind and solar power is installed to bring a total of 365kW of renewable energy, covering 80% of the daily electricity consumption.
JANUARY 2020 - Received a Carbon Neutral Factory certification by the Sustainable Furniture Consortium.
Example is attacked.
Compétences recommandées
Meilleures propositions de ce concours
-
AbodySamy Egypt
-
zebrafiche Bangladesh
-
ammarraji90 Malaysia
-
NurDalilah00 Malaysia
-
jaswanth17 India
-
AlexeCioranu Romania
-
MDJillur Bangladesh
-
amaanshahana007 India
-
FALL3N0005000 Pakistan
-
marianalufer Colombia
-
MDJillur Bangladesh
-
MDJillur Bangladesh
-
MDJillur Bangladesh
-
Puteriamelya Malaysia
-
ChiemiDesigns Zambia
-
NURAMIRAHATIKAH Malaysia
Tableau de clarification publique
Comment commencez des concours
-
Publiez votre concours Rapide et facile
-
Obtenez des tonnes de propositions De partout dans le monde
-
Attribuez la meilleure proposition Télécharger les fichiers - Facile !